My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
>
Address Records
>
ROCKEFELLER AVE
>
2701
>
NIMBUS
>
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 11:25:32 AM
Creation date
11/21/2023 10:18:17 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2701
Tenant Name
NIMBUS
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3072
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Opportrmnyzone Deveropmonr LLC <br />June 6, 2079 <br />JN 19152 <br />Page 10 <br />together. We recommend that an allowable adhesion value of 2,000 pounds per square <br />toot (psf) be used for the design of the soll nails. - <br />The process begins by making a 4- to 6400t vertical out In the shoring area followed <br />Immediately by the placement of anchors. The cut face is then covered with a wire mesh, <br />and shotcrete is placed over the mesh and soil face. Generally, no temporary, unsupported <br />excavations for soil -nail walls should be allowed to stand longer than 12 hours without the <br />acceptance of the geotechnical engineer. Furthermore, vertical cuts may be difficult in the <br />underlying clean, outwash sand without minor sloughing. It may be necessary to use eloped <br />cut faces or fill berms within the sand to install the soil nails; a shoring contractor should be <br />consulted about this situation. Once the shotcrete has hardened, the excavation again <br />proceeds and the nails are placed. A geotextile drainage composite must be placed over <br />the face of the cut prior to shotcreting to prevent buildup of hydrostatic pressures behind the <br />shotcrete facing. As the excavation progresses downward, the drainage composite strips <br />are extended, until reaching the base of the excavation, where weep holes are placed <br />through the shotcrete to be tied into an underelab footing drain. <br />Because soil nails are passive elements (they are not pre -stressed as tiebacks are), soil -nail <br />walls will typically deflect more than a soldier -pile wall. This Involves more risk of causing <br />damage to adjoining utilities, streets, and other on -grade elements. The shoring designer <br />should provide an estimate of the lateral deflection that is anticipated for the soil nail wall, <br />Caving of loose or granular soils, or in zones of seepage, can require that the shoring <br />contractor modify their installation techniques. This can Increase the cost and time <br />necessary to Install the nailed wall. This may specifically be an issue in the clean, <br />underlying, outman sand encountered beneath the she. Again, we recommend that the <br />shoring contractor be consulted regarding potential difficulties and modifications that can <br />occur during the construction of a soil -nailed wall. <br />This adhesion value should be substantiated by load -testing at least two anchors In each <br />soil type to at least 200 percent of their design capacity, prior to installing production <br />anchors. During shoring construction, at least 5 percent of the production anchors should <br />be proof -tested to 130 percent of the design anchor capacity. <br />The shoring designer will likely utilize one of several commercially available computer <br />programs to design the nailed walls. We recommend that the following soil strength <br />parameters be used in the nail wall design: <br />Soil Type <br />Moist Unit Effective internal Friction <br />Wd t c Angle l reea <br />1 <br />Effective Cohesion(psf) <br />FIIVlooae native <br />125 30 <br />50 <br />Glacial Till <br />140 1 40 <br />300 <br />Advance Outwaeh <br />Sand <br />135 42 <br />50 <br />Surcharges from adjacent existing structures and roads must be Included in the design. <br />EXCAVATION AND <br />As with any shoring system, there Is a potential risk of greater -than -anticipated movement of the <br />shoring and the ground outside of the excavation. This can translate into noticeable damage of <br />GEOTECH COnULTANTs, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.