My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
>
Address Records
>
ROCKEFELLER AVE
>
2701
>
NIMBUS
>
2701 ROCKEFELLER AVE NIMBUS 2024-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 11:25:32 AM
Creation date
11/21/2023 10:18:17 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2701
Tenant Name
NIMBUS
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3072
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />PUBLI ORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2nd Floor <br />Everett, WA 98201 <br />425-257-8810 <br />*Date Applied <br />Public Works Permit #: <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: <br />5/13/2020 <br />PW2005-013 <br />PREAPP19-033 <br />$590.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />TRENT DEVELOPMENT <br />EVERETT OZ DEV LLC <br />1420 Fifth Ave, Suite 2200 <br />1420 FIFTH AVE STE 220 <br />Seattle, WA, 98101 <br />SEATTLE, WA, 98101 <br />PHONE: 2062346543 <br />PHONE: 2062346543 <br />TAX PARCEL ID #: 00439162700100 <br />SITE ADDRESS: 2701 ROCKEFELLER AVE <br />DESCRIPTION: SHORING & EXCAVATION FOR NEW 8 STORY BLDG <br />SHORING & EXCAVATION PERMIT FOR PROPOSED BUILDING <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans and Construction SWPPP approved by the City of Everett Public Works Department dated <br />12/08/2020. Approved plans must remain on job -site at all times. <br />5. All excavated material shall be hauled to an approved, permitted site. <br />6. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br />request all required inspections. An Inspection Handout is provided at permit issuance with instructions on how to request an <br />inspection online. <br />7. Install and maintain erosion control measures per City of Everett Standards, approved SWPPP, and per the direction of the Public <br />Works Inspector. Remove upon completion of the project prior to final approval of the permit. <br />8. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />9. If an oversize load is to be used, contact the Traffic Engineering Department for Oversize Load Permits at 425-257-8810 (press <br />Option 7 for Traffic) prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks). A haul route will be <br />required to be submitted to the City of Everett prior to Oversize Load Permit issuance. <br />10. Proper safety measures shall be taken during construction to protect the public from the deep excavation and any other <br />construction hazard. Use construction fencing where necessary. Use appropriate traffic control measures follow plan per TSU2010- <br />007. <br />11. This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW-Site Final within the <br />Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br />Public Works Permit Fee Breakdown: <br />Erosion Control ...................................... $200.00 , -- l <br />r <br />Grade/Fill/Excavate (8,100CY)............... $350.00 2020 1 � <br />PW Plan Review ....................................... $20.00 <br />PW Site Inspection 20.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance of the <br />do, >� improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace <br />Approved for Construction, Public Works Dept. Date public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.