My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2804 GRAND AVE 2023-11-28
>
Address Records
>
GRAND AVE
>
2804
>
2804 GRAND AVE 2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:16:50 AM
Creation date
11/27/2023 6:44:29 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2804
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of forda6�e <br /> v/�r��/ PO Box 1255 [N PASS E]FAIL <br /> astiin jkn Cie E l u m,WA 98922 If you have any questions about your results <br /> (360) 333-2057 or your device failed please contact us now. <br /> Bac�ow I.I.(; <br /> BACKFLOW PREVENTION ASSEMBLY TEST REPORT <br /> WATER PURVEYOR Everett ACCOUNT# <br /> NAME OF PREMISE 2804 Grand Ave Food Co-op Commercial M Residential ❑ <br /> SERVICE ADDRESS 2804 Grand Ave CITY Everett ZIP 98201 <br /> CONTACT PERSON John looney PHONE(425876-4247 (John) FAX( ) <br /> LOCATION OF ASSEMBLY In back of coop left storage room near elevator 6' up <br /> DOWNSTREAM PROCESS Water purifier DCVA ❑ RPBA ® PVBA O OTHER <br /> NEW INSTALL B EXISTING ❑ REPLACEMENT❑ REMOVED ❑ OLD SER.# <br /> APPROVED DEVICE? YES® NO❑ PROPER INSTALLATION? YES ® NO ❑ <br /> MAKE OF ASSEMBLY Watts MODEL LF009M2QT SERIAL NO. 301407 SIZE 1" <br /> INITIAL DCVA/RPBA DCVA/RPBA RPBA PVBA/SVBA <br /> TEST CHECK VALVE NO.l CHECK VALVE NO.2 AIR INLET <br /> OPENED AT 3.1 PSID <br /> PASSED ® CLOSED TIGHT ® CLOSED TIGHT® OPENED AT PSID <br /> #1 CHECK 9.3 PSID <br /> LEAKED ❑ LEAKED ❑ DID NOT OPEN ❑ <br /> FAILED ❑ PSID PSID AIR GAP OK? X <br /> NEW CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART CHECK VALVE <br /> PARTS ❑ ❑ ❑ ❑ ❑ ❑ HELD AT PSID <br /> AND ❑ ❑ ❑ ❑ _ ❑ ❑ LEAKED ❑ <br /> REPAIRS ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ CLEANED ❑ <br /> REPAIRED ❑ <br /> TEST AFTER <br /> REPAIRS CLOSED TIGHT ❑ CLOSED TIGHT ❑ OPENED AT PSID AIR INLET PSID <br /> PASSED ❑ PSID PSID #1 CHECK PSID <br /> CHK VALVE PSID <br /> FAILED O <br /> AIR GAP INSPECTION:Required minimum air gap separation provided? Yes❑ No ❑ Detector Meter Reading <br /> LEFT SERVICE AS FOUND: ISO VALVE Open®Closed❑ SOV 1 Open ❑Closed ® SOV 2 Open❑Closed <br /> REMARKS: Downstream process not yet installed LINE PRESSURE 82 PSI <br /> METER NUMBER CONFINED SPACE? No <br /> TESTERS SIGNATURE: CERT.NO. B7464 DATE 10-24-23 <br /> TESTERS NAME PRINTED: Taro Smithson TESTERS PHONE#( 360}333-2057 <br /> REPAIRED BY: DATE <br /> FINAL TEST BY: CERT.NO. DATE <br /> CALIBRATION DATE 01-06-2023 GAUGE# 04192518 MODEL 845 SERVICE RESTORED? YES® NO❑ <br /> I certify that this report is accurate,and I hare used WAC 246-290-490 approved rest methods and rest equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.