Laserfiche WebLink
solely or concurrently negligent, and if the City suffers any loss or must pay or defend against any such claim, <br />suit, demand or damage as a result of such breach. <br /> <br />8. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution against the City. It <br />is agreed and mutually negotiated that in any and all claims against the City, its agents or employees, the <br />Contractor, a subcontractor, anyone directly or indirectly employed by the Contractor or subcontractor, or <br />anyone for whose acts any of them may be liable, the defense and indemnification obligations hereunder <br />shall not be limited in any way by any limitation on the amount of damages, compensation, or benefits <br />payable by or for the Contractor or any subcontractor under industrial worker’s compensation acts, disability <br />benefit acts, or other employees’ benefit acts. Contractor’s and City’s signatures hereto indicate specific <br />waiver of Contractor’s industrial insurance immunity in order to fulfill the indemnities hereunder. Solely for <br />the purpose of indemnification and defense as provided in this Contract, the Contractor specifically waives <br />any immunity under the State Industrial Insurance Law, Title 51 RCW. The Contractor expressly acknowledges <br />that this waiver of immunity under Title 51 RCW was the subject of mutual negotiation and was specifically <br />entered into pursuant to the provisions of RCW 4.24.115. <br /> <br />9. Repair of Damage. The Contractor agrees to repair and replace all property of the City and all <br />property of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> <br />10. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under this <br />contract is to be done at the Contractor’s risk and that: (1) prior to submitting its proposal or bid, it <br />became familiar with the conditions of excavation, subsurface, backfill, materials, climatic <br />conditions, location, traffic, and other contingencies that may affect the work and has made its bid <br />or proposal accordingly and (2) that it assumes the responsibility and risk of all loss or damage to <br />materials or work that may arise from any cause whatsoever prior to completion. <br /> <br />11. Headings for Convenience Only. The headings in this document are for convenience only, and <br />shall not be used or considered to interpret or construe this document. <br /> <br />12. Effective Date. This Contract is effective as of the date of the last person to sign it, and may be <br />executed in multiple counterparts, each of which shall be deemed an original. This Contract may be <br />signed with AdobeSign, and any such signature is fully binding. <br /> <br />[signatures on following page] <br /> <br />