Laserfiche WebLink
CONTENTS PAGE <br /> <br />CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br />A <br />INTRODUCTION--------------------------------------------------------------------------------------- 1 1 <br />DIVISION 1 GENERAL REQUIREMENTS ------------------------------------------------------ 1 2 <br /> 1-01.3 Definitions --------------------------------------------------------------------------------- 2 3 <br /> 1-02 BID PROCEDURES AND CONDITIONS ----------------------------------------------- 3 4 <br /> 1-02.1 Prequalification of Bidders ------------------------------------------------------------- 3 5 <br /> 1-02.2 Plans and Specifications --------------------------------------------------------------- 4 6 <br /> 1-02.5 Proposal Forms -------------------------------------------------------------------------- 4 7 <br /> 1-02.6 Preparation of Proposal ---------------------------------------------------------------- 5 8 <br /> 1-02.6(1) Recycled Materials Proposal ------------------------------------------------- 5 9 <br /> 1-02.7 Bid Deposit -------------------------------------------------------------------------------- 6 10 <br /> 1-02.9 Delivery of Proposal -------------------------------------------------------------------- 6 11 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal --------------------------- 6 12 <br /> 1-02.13 Irregular Proposals -------------------------------------------------------------------- 7 13 <br /> 1-02.14 Disqualification of Bidders ----------------------------------------------------------- 8 14 <br /> 1-02.15 Pre Award Information ---------------------------------------------------------------- 9 15 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT ------------------------------------------ 9 16 <br /> 1-03.1 Consideration of Bids ------------------------------------------------------------------- 9 17 <br /> 1-03.1(1) Identical Bid Totals -------------------------------------------------------------- 9 18 <br /> 1-03.3 Execution of Contract ----------------------------------------------------------------- 10 19 <br /> 1-03.4 Contract Bond -------------------------------------------------------------------------- 10 20 <br /> 1-03.7 Judicial Review -------------------------------------------------------------------------- 11 21 <br /> 1-04 SCOPE OF THE WORK ------------------------------------------------------------------- 11 22 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, --------- 12 23 <br /> 1-04.4 Changes --------------------------------------------------------------------------------- 12 24 <br /> 1.04-4(1) Minor Changes ----------------------------------------------------------------- 12 25 <br /> 1-05 CONTROL OF WORK --------------------------------------------------------------------- 12 26 <br /> 1-05.4 Conformity with and Deviations from Plans and Stakes ---------------------- 12 27 <br /> 1-05.7 Removal of Defective and Unauthorized Work --------------------------------- 15 28 <br /> 1-05.11 Final Inspection ----------------------------------------------------------------------- 16 29 <br /> 1-05.12 Final Acceptance --------------------------------------------------------------------- 17 30 <br /> 1-05.12(1) One-Year Guarantee Period ---------------------------------------------- 17 31 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor ---------------------- 18 32 <br /> 1-05.14 Cooperation with Other Contractors --------------------------------------------- 18 33 <br /> 1-05.18 Record Drawings --------------------------------------------------------------------- 18 34