My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 7 <br /> 1 <br />After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may 2 <br />withdraw, revise, or supplement it if: 3 <br /> 4 <br />1. The Bidder submits a written request signed by an authorized person and 5 <br />physically delivers it to the place designated for receipt of Bid Proposals, and 6 <br />2. The Contracting Agency receives the request before the time set for receipt of 7 <br />Bid Proposals, and 8 <br />3. The revised or supplemented Bid Proposal (if any) is received by the Contracting 9 <br />Agency before the time set for receipt of Bid Proposals. 10 <br /> 11 <br />If the Bidder’s request to withdraw, revise, or supplement its Bid Proposal is received 12 <br />before the time set for receipt of Bid Proposals, the Contracting Agency will return the 13 <br />unopened Proposal package to the Bidder. The Bidder must then submit the revised or 14 <br />supplemented package in its entirety. If the Bidder does not submit a revised or 15 <br />supplemented package, then its bid shall be considered withdrawn. 16 <br /> 17 <br />Late revised or supplemented Bid Proposals or late withdrawal requests will be date 18 <br />recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed 19 <br />requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. 20 <br /> 21 <br />1-02.13.RTF 22 <br />1-02.13 Irregular Proposals 23 <br />(December 30, 2022 APWA GSP) 24 <br /> 25 <br />Delete this section and replace it with the following: 26 <br /> 27 <br />1. A Proposal will be considered irregular and will be rejected if: 28 <br />a. The Bidder is not prequalified when so required; 29 <br />b. The authorized Proposal form furnished by the Contracting Agency is not used 30 <br />or is altered; 31 <br />c. The completed Proposal form contains any unauthorized additions, deletions, 32 <br />alternate Bids, or conditions; 33 <br />d. The Bidder adds provisions reserving the right to reject or accept the award, or 34 <br />enter into the Contract; 35 <br />e. A price per unit cannot be determined from the Bid Proposal; 36 <br />f. The Proposal form is not properly executed; 37 <br />g. The Bidder fails to submit or properly complete a subcontractor list (WSDOT 38 <br />Form 271-015), if applicable, as required in Section 1-02.6; 39 <br />h. The Bidder fails to submit or properly complete a Disadvantaged Business 40 <br />Enterprise Certification (WSDOT Form 272-056), if applicable, as required in 41 <br />Section 1-02.6; 42 <br />i. The Bidder fails to submit Written Confirmations (WSDOT Form 422-031) from 43 <br />each DBE firm listed on the Bidder’s completed DBE Utilization Certification 44 <br />that they are in agreement with the bidder’s DBE participation commitment, if 45 <br />applicable, as required in Section 1-02.6, or if the written confirmation that is 46 <br />submitted fails to meet the requirements of the Special Provisions; 47 <br />j. The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, 48 <br />as required in Section 1-02.6, or if the documentation that is submitted fails to 49 <br />demonstrate that a Good Faith Effort to meet the Condition of Award was made; 50
The URL can be used to link to this page
Your browser does not support the video tag.