My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 12 <br />1-04.2.RTF 1 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 2 <br />Specifications, and Addenda 3 <br />(December 30, 2022 APWA GSP) 4 <br /> 5 <br />Revise the second paragraph to read: 6 <br /> 7 <br />Any inconsistency in the parts of the contract shall be resolved by following this order of 8 <br />precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 9 <br />1. Addenda, 10 <br />2. Proposal Form, 11 <br />3. Special Provisions, 12 <br />4. Contract Plans, 13 <br />5. Standard Specifications, 14 <br />6. Contracting Agency’s Standard Plans or Details (if any), and 15 <br />7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 16 <br /> 17 <br />1-04.4.RTF 18 <br />1-04.4 Changes 19 <br />(January 19, 2022 APWA GSP) 20 <br /> 21 <br />The first two sentences of the last paragraph of Section 1-04.4 are deleted. 22 <br /> 23 <br />F1-04.4(1).docx 24 <br />1-04.4(1) Minor Changes 25 <br />(May 30, 2019 APWA GSP) 26 <br /> 27 <br />Delete the first paragraph and replace it with the following: 28 <br /> 29 <br />Payments or credits for changes amounting to *** $25,000 *** or less may be made under 30 <br />the Bid item “Minor Change”. At the discretion of the Contracting Agency, this procedure 31 <br />for Minor Changes may be used in lieu of the more formal procedure as outlined in Section 32 <br />1-04.4, Changes. All “Minor Change” work will be within the scope of the Contract Work 33 <br />and will not change Contract Time. 34 <br /> 35 <br />1-05.GR1 36 <br />1-05 Control of Work 37 <br /> 38 <br />1-05.4.GR1 39 <br />1-05.4 Conformity with and Deviations from Plans and Stakes 40 <br /> 41 <br />1-05.4.INST1.GR1 42 <br />Section 1-05.4 is supplemented with the following: 43 <br /> 44 <br />1-05.4.OPT2.GR1 45 <br />(January 13, 2021) 46 <br />Contractor Surveying - Roadway 47 <br />The Contracting Agency has provided primary survey control in the Plans. 48 <br /> 49 <br />The Contractor shall be responsible for setting, maintaining, and resetting all alignment 50 <br />stakes, slope stakes, and grades necessary for the construction of the roadbed, drainage, 51
The URL can be used to link to this page
Your browser does not support the video tag.