Laserfiche WebLink
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 23 <br />3. Fabrication of the products: 1 <br /> 2 <br />a. Spinning wire into cable or strand. 3 <br /> 4 <br />b. Corrugating and rolling into culverts. 5 <br /> 6 <br />c. Shop fabrication. 7 <br /> 8 <br />A certification of materials origin will be required for all items comprised of, or containing, 9 <br />steel or iron construction materials prior to such items being incorporated into the 10 <br />permanent work. The Contractor will not receive payment until the certification is received 11 <br />by the Engineer. The certification shall be on WSDOT Form 350-109 provided by the 12 <br />Engineer, or such other form the Contractor chooses, provided it contains the same 13 <br />information as WSDOT Form 350-109. 14 <br /> 15 <br />Manufactured Products 16 <br />Due to a nationwide waiver, BABA requirements do not apply to manufactured products. 17 <br />Manufactured products that contain steel and iron, regardless of a nationwide waiver, will 18 <br />follow “Steel and Iron Requirements” of this Specification. 19 <br /> 20 <br />Construction Material Requirements 21 <br />A Contractor provided certification of materials origin will be required before each 22 <br />progress estimate or payment. The Contractor will not receive payment until the 23 <br />certification is received by the Engineer. The Contractor shall certify that all construction 24 <br />materials installed during the current progress estimate period meets the Build America, 25 <br />Buy America Act. The certification shall be on WSDOT Form 350-110 provided by the 26 <br />Engineer, or such other form the Contractor chooses, provided it contains the same 27 <br />information as WSDOT Form 350-110. 28 <br /> 29 <br />1-06.1(4).RTF 30 <br />1-06.1(4) Fabrication Inspection Expense 31 <br />(June 27, 2011 AWPA GSP) 32 <br /> 33 <br />Delete this section in its entirety. 34 <br /> 35 <br />1-06.6.RTF 36 <br />1-06.6 Recycled Materials 37 <br />(January 4, 2016 APWA GSP) 38 <br /> 39 <br />Delete this section, including its subsections, and replace it with the following: 40 <br /> 41 <br />The Contractor shall make their best effort to utilize recycled materials in the construction 42 <br />of the project. Approval of such material use shall be as detailed elsewhere in the 43 <br />Standard Specifications. 44 <br /> 45 <br />Prior to Physical Completion the Contractor shall report the quantity of recycled materials 46 <br />that were utilized in the construction of the project for each of the items listed in Section 9-47 <br />03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled 48 <br />glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material 49 <br />and aggregates from concrete returned to the supplier). The Contractor’s report shall be 50 <br />provided on DOT form 350-075 Recycled Materials Reporting. 51 <br /> 52