My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 23 <br />3. Fabrication of the products: 1 <br /> 2 <br />a. Spinning wire into cable or strand. 3 <br /> 4 <br />b. Corrugating and rolling into culverts. 5 <br /> 6 <br />c. Shop fabrication. 7 <br /> 8 <br />A certification of materials origin will be required for all items comprised of, or containing, 9 <br />steel or iron construction materials prior to such items being incorporated into the 10 <br />permanent work. The Contractor will not receive payment until the certification is received 11 <br />by the Engineer. The certification shall be on WSDOT Form 350-109 provided by the 12 <br />Engineer, or such other form the Contractor chooses, provided it contains the same 13 <br />information as WSDOT Form 350-109. 14 <br /> 15 <br />Manufactured Products 16 <br />Due to a nationwide waiver, BABA requirements do not apply to manufactured products. 17 <br />Manufactured products that contain steel and iron, regardless of a nationwide waiver, will 18 <br />follow “Steel and Iron Requirements” of this Specification. 19 <br /> 20 <br />Construction Material Requirements 21 <br />A Contractor provided certification of materials origin will be required before each 22 <br />progress estimate or payment. The Contractor will not receive payment until the 23 <br />certification is received by the Engineer. The Contractor shall certify that all construction 24 <br />materials installed during the current progress estimate period meets the Build America, 25 <br />Buy America Act. The certification shall be on WSDOT Form 350-110 provided by the 26 <br />Engineer, or such other form the Contractor chooses, provided it contains the same 27 <br />information as WSDOT Form 350-110. 28 <br /> 29 <br />1-06.1(4).RTF 30 <br />1-06.1(4) Fabrication Inspection Expense 31 <br />(June 27, 2011 AWPA GSP) 32 <br /> 33 <br />Delete this section in its entirety. 34 <br /> 35 <br />1-06.6.RTF 36 <br />1-06.6 Recycled Materials 37 <br />(January 4, 2016 APWA GSP) 38 <br /> 39 <br />Delete this section, including its subsections, and replace it with the following: 40 <br /> 41 <br />The Contractor shall make their best effort to utilize recycled materials in the construction 42 <br />of the project. Approval of such material use shall be as detailed elsewhere in the 43 <br />Standard Specifications. 44 <br /> 45 <br />Prior to Physical Completion the Contractor shall report the quantity of recycled materials 46 <br />that were utilized in the construction of the project for each of the items listed in Section 9-47 <br />03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled 48 <br />glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material 49 <br />and aggregates from concrete returned to the supplier). The Contractor’s report shall be 50 <br />provided on DOT form 350-075 Recycled Materials Reporting. 51 <br /> 52
The URL can be used to link to this page
Your browser does not support the video tag.