My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 59 <br />3.15” is revised to read; ”FOR WALLS WITH SINGLE SLOPE TRAFFIC BARRIER, SEE 1 <br />CONTRACT PLANS” 2 <br />Sheet 1, Typical Section, callout – “FOR WALLS WITH F-SHAPE TRAFFIC BARRIER. 3 <br />USE THE DETAILS ABOVE THE MATCH LINE ON STANDARD PLAN D-3.16” is revised 4 <br />to read; ”FOR WALLS WITH F-SHAPE TRAFFIC BARRIER, SEE CONTRACT PLANS” 5 <br /> 6 <br />D-3.11 7 <br />Sheet 1, Typical Section, callout – “”B” BRIDGE APPROACH SLAB (SEE BRIDGE 8 <br />PLANS) OR PERMANENT GEOSYNTHETIC WALL BARRIER ~ SEE STANDARD 9 <br />PLANS D-3.15 OR D-3.16” is revised to read; ”B” BRIDGE APPROACH SLAB OR 10 <br />MOMENT SLAB (SEE CONTRACT PLANS) 11 <br />Sheet 1, Typical Section, callout – “TYPICAL BARRIER ON BRIDGE APPROACH SLAB 12 <br />(SEE BRIDGE PLANS) OR PERMANENT GEOSYNTHETIC WALL BARRIER ~ SEE 13 <br />STANDARD PLANS D-3.15 OR D-3.16” is revised to read; “TYPICAL BARRIER ON 14 <br />BRIDGE APPROACH SLAB OR MOMENT SLAB (SEE CONTRACT PLANS) 15 <br /> 16 <br />D-10.10 17 <br />Wall Type 1 may be used if no traffic barrier is attached on top of the wall. Walls with traffic 18 <br />barriers attached on top of the wall are considered non-standard and shall be designed 19 <br />in accordance with the current WSDOT Bridge Design Manual (BDM) and the revisions 20 <br />stated in the 11/3/15 Bridge Design memorandum. 21 <br /> 22 <br />D-10.15 23 <br />Wall Type 2 may be used if no traffic barrier is attached on top of the wall. Walls with traffic 24 <br />barriers attached on top of the wall are considered non-standard and shall be designed 25 <br />in accordance with the current WSDOT BDM and the revisions stated in the 11/3/15 26 <br />Bridge Design memorandum. 27 <br /> 28 <br />D-10.30 29 <br />Wall Type 5 may be used in all cases. 30 <br /> 31 <br />D-10.35 32 <br />Wall Type 6 may be used in all cases. 33 <br /> 34 <br />D-10.40 35 <br />Wall Type 7 may be used if no traffic barrier is attached on top of the wall. Walls with traffic 36 <br />barriers attached on top of the wall are considered non-standard and shall be designed 37 <br />in accordance with the current WSDOT BDM and the revisions stated in the 11/3/15 38 <br />Bridge Design memorandum. 39 <br /> 40 <br />D-10.45 41 <br />Wall Type 8 may be used if no traffic barrier is attached on top of the wall. Walls with traffic 42 <br />barriers attached on top of the wall are considered non-standard and shall be designed 43 <br />in accordance with the current WSDOT BDM and the revisions stated in the revisions 44 <br />stated in the 11/3/15 Bridge Design memorandum. 45 <br /> 46 <br />D-15.10 47 <br />STD Plans D-15 series “Traffic Barrier Details for Reinforced Concrete Retaining Walls” 48 <br />are withdrawn. Special designs in accordance with the current WSDOT BDM are required 49 <br />in place of these STD Plans. 50 <br /> 51 <br />D-15.20 52
The URL can be used to link to this page
Your browser does not support the video tag.