My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G&E Engineering 11/27/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
G&E Engineering 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 3:50:52 PM
Creation date
11/27/2023 3:50:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
G&E Engineering
Approval Date
11/27/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2024 Everett Water System Vulnerability Assessment
Tracking Number
0004036
Total Compensation
$88,660.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />The City will provide copies of clean water dives / corrosion / painting efforts for its reservoirs <br />and tanks, in particular any prior recommendations that address leakage (and past repairs) for <br />reservoir liners; and latest condition of the interiors of steel tanks (corrosion). <br /> <br />The assessment includes one day field inspection by Mr. Eidinger of water system facilities. The <br />City will provide staff to visit and provide access to these sites. The site inspection will be <br />performed after the drawings for these facilities have been reviewed. During this inspection, Mr. <br />Eidinger will evaluate the style of installation, in particular seismic detailing. Mr. Eidinger may <br />also perform non-destructive testing (steel plate thickness tests; rebar detection). If suitable, he <br />will collect paint samples of older (pre-1980) steel tanks that are suspected of possibly using <br />lead-based paint, for purpose of lead-based paint assessments. The cost and performance of lead- <br />based paint assessments will done by COE; if by G&E, the cost for such work will be identified <br />and agreed upon before doing such work.
The URL can be used to link to this page
Your browser does not support the video tag.