My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5503 COLBY AVE 2023-12-04
>
Address Records
>
COLBY AVE
>
5503
>
5503 COLBY AVE 2023-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 9:05:36 AM
Creation date
11/28/2023 6:42:41 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5503
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ftwifta- <br /> CAPSTONEE <br /> SOLAR <br /> P.O Box 715 <br /> NO : <br /> SM <br /> SOLAR CODE COMPLIANCE NOTES ; ■ .ONSM <br /> SOLAR STANDARD SYSTEM GROUNDING ■ Contractor ELi eOn eD,WA 98073 <br /> CCAPSTS18830S <br /> ENDl' ■■ MOUNT INSTALLATION-GUIDE--:-PA-G-E Electrical License:EC CAPSTS1868JD <br /> ■■ l MOUNT INSTALLATION GUIDE PAGE l <br /> - -------------------- - - ---------------------------------------------------------------- <br /> UL2703 CERTIFICATION MARKING LABEL —c, `- WEEBLUG TERMINALTORQUE, <br /> Unirac SOLARMOUNT is listed to UL 2703.Certification marking is embossed on a0 mid clamps as shown.LabeLs with UNIRAC Single Use Only Innate C-dncmr and <br /> additional information will.be provided.After the racking system is fully assembled,a single Label should be appLied to - toque tot efollowin <br /> the SOLARMOUNT rail at the edge of the array. ® <br /> Before applying the Label,the corners of the Label that do not pertain to 6-14 AWG:Sft-I <br /> the system being installed must be removed so that only the instatted system type is showing. S A -- <br /> Note:The sticker label should be placed such that it is visible,but not outward facing. C usONLY ONE LUG PER ROW OF MODULES: <br /> - Only one lug per row of modules is <br /> 266909 required.See page 4 for additional <br /> Lugs required for expansion joints. - - 55 <br /> 1 WEEBLUG CONDUCTOR-UNIRAC P/N 0080025: <br /> Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance VERSION <br /> -` hole in the stainless steel flat washer.Place the stainless steel flat washer on the <br /> _ boll,oriented so the dimples wiLL contact the aLuminum rail.PLace the lug portion DESCRIPTION DATE REV <br /> on the bolt and stainless steel flat washer.I nstatt stainless steel.flat washer,Lock INITIAL RELEASE 11/01/2023 UR <br /> washer and nut.Tighten the nut until the dimpLes are completely embedded into <br /> the rail.and Lug. <br /> - TORQUE VALUE 10 ft tbs. <br /> c6cv�,�.:`: '~ See product data sheet for more details,Model No.WEEB-LUG-6.7 <br /> SM STANDARD RAIL �'^"`" • / SM LIGHT RAIL =••-•- `°"°' <br /> GROUNDING LUG MOUNTING DETAILS: star Washer is <br /> Details are provided for both the WEEB and ILsco products.The WEEBLug has singte Use only <br /> a grounding symbol located on the tug assembly The IIsco tug has a green <br /> colored set screw for grounding indication purposes.Installation must be in <br /> accordance with NFPA NEC 70,however the electrical designer of record should <br /> referto the Latest revision of NEC for actual grounding conductor cable size. TERMINALTORQUE, ANNUAL PRODUCTION <br /> Required if not using approved integrated grounding microimeters Instancondudorand ESTIMATE 5,686 kWh's <br /> torque to the following: <br /> 4-6 AWG:35in-lbs <br /> 8 AWG:25 in-lbs <br /> GROUNDING LUG-BOLT SIZE&DRILL SIZE 10-14AWG:20 in-lbs <br /> GROUND LUG BOLT SIZE DRILL SIZE ILSCO LAY-IN LUG CONDUCTOR-UNIRAC P/N 008009P:Alternate Grounding <br /> WEEBLug 1/4" N/A-Place in Top SM Rail.Slot Lug-Drill,deburr hole and bolt thru both rail watts per table. <br /> ILSCO Lug a10-32 7/32• TORQUE VALUE 5 ft lbs. <br /> • Torque value depends on conductor size. See 1—U product data sheet for more details,Model No.GBL-4DBT. <br /> • See product data sheet for torque value. <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION <br /> PROJECT NAME <br /> �;; SOLAR BONDING CONNECTION GROUND PATHS ■ �;; SOLAR APPENDIX D ■ � o � <br /> ■■ : �� MOUNT INSTALLATION GUIDE PAGE l l D O <br /> ■■ l �� MOUNT UN ENDCLAMP INSTALLATION GUIDE l PAGE <br /> ` - -------------------------------------------------------- <br /> .. N r-i,,, <br /> LUYro <br /> O) O DW G s LU co 00 Z LL <br /> � —iLn (/) <br /> /©� U O 31C MIN. t O \ 0) O <br /> It <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAIL TO L•F00T w/BONDING T-BOLT <br /> U o <br /> Bonding Hardware c--bond I,—sptice Serrated flange mm <br /> nut —L-motanodi-ion <br /> OAluminum mid clamp with stainl.ess steel.bonding pins that pierce mode Le frame O bar and—h rail Won Oto bond L-Foot to stainless reN T-bolt t J O I <br /> anodiration to bond moaul.e to module through damp Awm--puce bar spans a cross raft gap to Serrated T-bohhcad penetratesrailanodization O . J <br /> ©create ratro rad b1nd.RnBon at tear one side STEP 1:Position clamp to align STEP 2:Rotate clamp clockwise 2/3 STEP 3:Place module at Least 3/4" STEP4:White applying pressure to it _ <br /> ©$ainl.ess eelnut bonds aluminum cl.amptosainl.esss eel.T-bolt ©mbontl T-Wt, ,antl L-foo to grountletl W 'f{. <br /> of spnae wet ba gmnneea. SM ran T-bolt with rail slat.Lower clamp of a turn to engage T-boR inside rail from end of rail and position damp hold the clamp against the module, �^ N 7 <br /> ©Serrated T-bolt head penetrates rail.anodization to bond T-bon,nut,damp,and Note:Space berets betted tnnnesuen ere and Insert T-bo It into rail slot slot. against module frame. push down on the module side of L7 J If Z <br /> moduLes to SM rail on-s[rud—Thesplice barfundion is nil the clamp cap. W A <br /> alignment aM bontling. L.L <br /> 1' E g w a Q <br /> N"-: <br /> "- W9 per module row requiree _ 0�3""`Awin PT'Y�E� �40� <br /> 4 <br /> 1 - , T-BOLT©E��G N RKyls4, � � < 3• 30 mm 31 d ii mm 35 mm <br /> E p B <br /> c�a <br /> K SYSTEM e BONDING ONpING RAIL 3AV 0 <br /> DND MICROINVEUER PUCEBAR <br /> Option 1: MOUNT / <br /> Ground Through SEE NOTE WEE t RI 6 'i SHEET NAME <br /> Enph--Cable a a a <br /> 38 mm 40 mm 46 mm <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND SPEC SHEETS <br /> O He,n't rni—in isherre�Ptiw:loctwl—stones metal O Gree6 bond b dimples pierce anoaieee it so STEP 5:When the cap contacts the STEP 6:Tighten bolt and torque to 15 STEP 7:Confirm clamp is engaged in correct module height position and that <br /> rflangem rainless steN T-bolt crea ebone between rail antl Wg <br /> BONDING ASSEM IN 4- _ $crated T-bolt head penetrates rail anodlzation module frame,release and it will ft-lbs. the top of the cap is sitting level with the module frame. <br /> ASSEMBLY �— ©[o bond T-bolt nut,and Lfoot to grounded 0S—idafipet W,emground ton-i.n.Lug u[etlm re-engage to the clamp base. <br /> sMrail.. pmmaegnatsystemgropmmnnecuon' NOTE-Universal AF End NOTE:When 46mmmodules,loosenboltb IturnbeforepositioningSHEET SIZE <br /> Q `•_ C mndnte:n„v ne,rr.�,en,�„neT,«�e r.nnntabN NO-11u Wigan alw be osedwhen—redas P 9 Y <br /> Option 2:Ground Ug wi - - mepwosee-i n,r--,terns see pageu we side of me rail see page mreamaiu single use. clamp against module frame.Do not force clamp onto module frame as this <br /> Barecopper W n, RAILTO L-FOm Por tletails <br /> may damage the bonding pin. <br /> ANSI B <br /> 11rt X 17” <br /> SHEET NUMBER <br /> PV-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.