Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: B2203-019 Additional Notes: <br /> Project Address: 3202 51st PL SW Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett ,��v��"��W� F <br /> Sewer District: Everett Prepared By: fjt U AA Date:�jI ZA I ZOZ7/ <br /> Outside City Limits? No *Adds a 25%Surcharge Supportive Housing Credit? No *Reduces by 80% Reviewed By: H!\Y Date:!/'j)f <br /> a� <br /> Fee Calculations: � � I <br /> Stormwater System Development Fees: <br /> Permit#: B2203-019 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 105 SF • <br /> Stormwater System Dev Fee: $28.12 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: - SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br /> • <br />