My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9008 CORBIN DR 2023-12-04
>
Address Records
>
CORBIN DR
>
9008
>
9008 CORBIN DR 2023-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 3:51:37 PM
Creation date
11/28/2023 10:38:09 AM
Metadata
Fields
Template:
Address Document
Street Name
CORBIN DR
Street Number
9008
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WAC 296-46B 900: ELECTRICAL,`PLA�1 REU(EUV .J <br /> EVRET:T <br /> wti,�waroN.- - <br /> DIRECTI NS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to(a)to <br /> tell City Sta'ff;if plan review is not requried and select the box next to the specific reason from WAC 296-4613-900. If plan review is <br /> required,select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(I(i, iii,or v) is selected,the work must also comply with section (a)-(vii).See arrow flow chart below. <br /> (3)Electrical plan review. <br /> ❑ (a)Electrical plan review is not required for: <br /> ❑ (i)Low voltage systems; <br /> 4--El (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii)Heating and c6gling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project\provided there is not a corresponding increase in the available fault current in any feeder. <br /> El does <br /> Stand-alone utility f� services that do not exceed 250 volts,400 amperes.'Where the project's distribution system <br /> does not include: <br /> (A)Emergency s tems other than listed unit equipment per NEMC 700.12(F); <br /> (B)An essential elicaI system defined in NEC 517.2;or <br /> (C)A required fire pum i system. i <br /> (v)Modifications to existing electrical installations where all of thefollowingconditions are met: <br /> (A)Service or distribution eq ii ment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuitsot exceeding 277 volts to ground; <br /> (B)Does not involve emergency syems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits r feederof an essential electrical system as defined in NEC 517.2; <br /> and i <br /> (D)Service or feeder load calculations ar /increased by 5%or less. <br /> ❑ (vi)Electric power production source(s)such as sgIar p otovoltaic,fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. j <br /> (vii) For installations in(a)(ii),(iii),and(v)o 'this subsec 'on to be considered,the following must be available <br /> ❑ to the electrical inspector before the w:;rXDptr1ion <br /> is initiated: <br /> (A)A clear and adequate des of the project's s pe', <br /> (B)A load calculation(s); <br /> d chan are providing both before and er panel schedules as needed;and <br /> (C)What the load g�j , p g <br /> (D)Provide information -howing that the service and feeder( supplying the panel(s)where the work is <br /> taking place has ade (ate capacity for any increased load and as code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan revie Is not required for"Medical,dental,and chiropract , clinic"of which is a clinic or <br /> ❑ physicians'office where p lents are not regularly kept as bed patients for twenty- •ur hours or more, per section <br /> (1)(c)(xii). <br /> ❑ (b) Electrical plan review is re ired for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this apter. <br /> ❑ (c)If a review is req/90 <br /> a electrical plan must be submitted for review and approval before the ell e trical work is begun. <br /> TablTable 900-2 <br /> Health or PersoFacilities Educational and Institutional Facilities,Places of Assembly,or oche Facilities <br /> Health or Personal Cay PlanReviewEducational,Institutional,or Plan Review <br /> ypeRequired <br /> other Facility Types Required <br /> Hospital Yes <br /> Nursing homeunito long-term Yes Educational Yes <br /> care unit Institutional Yes <br /> Boarding home Yes <br /> Assisted living facility Yes <br /> Private alcoholism hospital Yes Notes to Tables 900.1 and 900.2. <br /> Private psychiatric hospital Yes 1.A city authorized to do electrical inspections <br /> Maternity home Yes may require plan review on facility types not <br /> Ambulatory surgery facility Yes reviewed by the department. <br /> Renal hemodialysis clinic Yes <br /> Residential treatment facility Yes <br /> Enhanced service facility Yes <br /> Adult residential rehabilitation Yes PERMIT# Page 2-Plan Review <br /> center <br />
The URL can be used to link to this page
Your browser does not support the video tag.