My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/11/29 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/11/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:53:02 AM
Creation date
11/29/2023 6:06:59 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with <br />Jacobs Engineering Group, Inc. <br />Council Bill # <br /> <br />Consideration: Amendment to Professional Services Agreement <br />Project: 41st Street to Rucker Avenue Corridor Phase 2 <br />Partner/Supplier: Jacobs Engineering Group, Inc <br /> Location: 41st Street to W. Marine View Drive <br />Preceding action: Council authorized original PSA 9/14/2022 <br />Fund: 303 – Public Works Improvement Projects <br />Agenda dates requested: <br />November 15, 2023 <br /> <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Contract Amendment #1 <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />(425) 257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br /> <br />Initialed by: <br /> RS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />This amendment is a time extension only. The total cost of this agreement remains <br />unchanged. <br /> <br /> <br />Project summary statement: <br />Phase 1 improvements to the corridor consisting of intersection improvements at 41st & <br />Rucker, Rucker & Pacific, and Pacific & W. Marine View Drive were completed in 2018. <br />The City received Connecting Washington funding for Phase 2 Improvements to the <br />arterial corridor from I-5 & 41st to West Marine View Drive. This phase 2 of the project <br />will provide additional improvements to the corridor to improve freight mobility and <br />increase pedestrian safety. <br /> <br />Jacobs Engineering Group, Inc is continuing to provide support to the City throughout <br />the alternative evaluation process, which is expected to be completed by 12/31/2024. <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 1 to the Professional Services <br />Agreement with Jacobs Engineering Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.