Laserfiche WebLink
FIRE ALARM ABBREVIATIONS LEGEND <br /> ALT SECONDARY OR ALTERNATE ELEVATOR RECALL NAC NOTIFICATION APPLIANCE CIRCUIT OR POWER SUPPLY SEE SHEET EO FOR LEGEND AND ABBREVIATIONS <br /> BEAM DET BEAM DETECTOR OS&Y OUTSIDE SCREW AND YOKE VAVVE <br /> CDR COMPUTER/NETWORK/DATA/IDF ROOM PD PUMP DISCHARGE VALVE <br /> COL COLUMN PH PENTHOUSE <br /> COMM FAIL COMMUNICATION FAILURE PIV POST INDICATOR VALVE <br /> CTRL CONTROL POWER FAIL FACP POWER FAILURE <br /> CW CATWALK PREACT PREACTION SYSTEM <br /> DIVER DAMPER PRI PRIMARY <br /> DD DUCT SMOKE DETECTOR PS PUMP SUPPLY VALVE <br /> DIESEL DIESEL PWR POWER <br /> FP FIRE PUMP RF ROOF <br /> ELEC ELECTRICAL; ELECTRICAL ROOM RLY RELAY <br /> ELEV ELEVATOR SEC SECTION VALVE <br /> EPP EXCESS PRESSURE PUMP SHUNT SHUNT TRIP <br /> FACP FIRE ALARM CONTROL PANEL SMK SMOKE DETECTOR <br /> EL17V FF HAT LIGHT FIRE FIGHTER HAT LIGHT IN A ELEVATOR STL STALL <br /> FLR FLOOR STROBE STROBE, HORN OR ANY NOTIFICATION DEVICE <br /> FM FIRE MAIN VALVE SUPER SUPPRESSION <br /> HEAT HEAT DETECTOR SUPV SUPERVISORY GENERAL NOTES <br /> INTDEV INTERFACE DEVICE, MONITORING OR CONTROL SV SPRINKLER VALVE <br /> ISO ISOLATION VALVE TAMPER TAMPER SWITCH <br /> KITCHEN KITCHEN TL300 TL300 TYCO COMMUNICATION DEVICE <br /> L BATT LOW BATTERY TRBL TROUBLE <br /> L FUEL LOW FUEL (FIRE PUMP DIESEL TANK IS BELOW 50% FILLED) UV UNIT VALVE <br /> LEY LOBBY VLV VALVE <br /> LRD LOW RATE DISCHARGE WF WATERFLOW SWITCH <br /> MAN PULL MANUAL PULL STATION ZN ZONE <br /> MECH MECHANICAL ROOM <br /> POINT NUMBER/ZONE BOEING DESCRIPTION FACP POINT - COMMENTS - GRID/SHEET LOC. <br /> 11:001 / 122 SMK ELEV 1 IST FLR — A/13 — L506-3 <br /> 11:002 / 123 SMK ELEV 1 2ND FLR ION — A/13 — E506-3 <br /> 11:003 / 124 SMK ELEV 1 3RD FLR ION — A/13 — E506-3 <br /> 11:004 / 125 SMK ELEV 1 CATWALK — A/13 — E506-3 <br /> L1:005 / 126 SMK ELEV 1 TOP OF SHAFT — A/13 — E506-3 <br /> 11:006 / 127 SMK ELEV 1 MACH RM — A/13 — E506-3 REFERENCE DRAWINGS <br /> 11:007 / 128 SV31-4 TAMPER OS&Y SPRINKLER VALVE — J.2/12.2 TUNNEL — 40-30—TNE263 <br /> 1:008 / 129 SV31-4 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/12 — 117260 <br /> -1:009 / 12F SV31-4 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/12 — 1E260 <br /> 11:010 / 12B SV31-6 TAMPER OS&Y SPRINKLER VALVE — J.2/12.3 TUNNEL — 40-30—TNE263 <br /> 11:011 / 12C SV31-6 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/12 — 1E260 <br /> 11:012 / 12D SV31-6 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/12 — 1E260 <br /> 11:013 / 12E SV31-8 TAMPER OS&Y SPRINKLER VALVE — J.2/14.1 TUNNEL — 40-30—TNE264 <br /> 11:014 / 130 SV31-8 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/14 — 1E261 <br /> 11:015 / 131 SV31-8 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/14 — 1E261 <br /> 11:016 / 132 SV31-10 TAMPER OS&Y SPRINKLER VALVE — J.2/14.2 TUNNEL — 40-30—TNE264 <br /> 11:017 / 133 SV31-10 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/14 — 1E261 <br /> 11:018 / 134 SV31-10 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/14 — 1E261 <br /> 11:019 / 135 SV31-12 TAMPER OS&Y SPRINKLER VALVE — J.2/15.2 TUNNEL — 40-30—TNE265 <br /> 11:020 / 136 SV31-12 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/15 — 1E262 <br /> 11:021 / 137 SV31-12 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/15 — 1E262 CONSTRUCTION <br /> N OTE S <br /> 11:022 / 138 SV31-14 TAMPER OS&Y SPRINKLER VALVE — J.2/17 TUNNEL — 40-30—TNE265 <br /> 11:023 / 139 SV31-14 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — A/17 — 117262 <br /> 11:024 / 13F SV31-14 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — A/17 — 1E262 <br /> 11:025 / 13B SMK @ FACP — A.5/13 — 1E261 A <br /> L1:027 / 13D SV30-1 TAMPER OS&Y PRI KLE VALVE — K 11 TUNNEL — 40-053—TNE271 <br /> 11:028 / 13E SV30-1 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — K/11 — 40-030-117263 <br /> 11:029 / 140 SV30-1 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — K/11 — 40-030-117263 <br /> 11:030 / 141 SV30-2 TAMPER OS&Y SPRINKLER VALVE — J.2/12.9 TUNNEL — 40-030—TNE263 <br /> 11:031 / 142 SV30-2 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — H/13 — 40-030-1E260 <br /> 11:032 / 143 SV30-2 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — H/13 — 40-030-1E260 <br /> 11:033 / 144 SV30-2A TAMPER OS&Y SPRINKLER VALVE — J.2/13 TUNNEL — 40-030—TNE264 <br /> 11:034 / 145 SV30-2A WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — 1/14 — 40-030-1E264 <br /> 11:035 / 146 SV30-2A WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — 1/14 — 40-030-1E264 <br /> 11:036 / 147 SV30-3 TAMPER OS&Y SPRINKLER VALVE — J.2/12.6 TUNNEL — 40-030—TNE263 <br /> 11:037 / 148 SV30-3 WF PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — J/13 — 40-030—lE263 <br /> 11:038 / 149 SV30-3 WF ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — J/13 — 40-030-1E263 <br /> L1:039 / 14F SV30-4 TAMPER OS&Y SPRINKLER VALVE — J.2/14.8 TUNNEL — 40-030—TNE264 <br /> L1:040 / 14B SV30-4 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — H/15 — 40-030—lE261 <br /> L1:041 / 14C SV30-4 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — H/15 — 40-030—lE261 <br /> 11:042 / 14D SV30-5 TAMPER OS&Y SPRINKLER VALVE — J.2/15.1 TUNNEL — 40-030—TNE265 <br /> 11:043 / 14E SV30-5 WE PRESSURE WATERFLOW PRESSURE SWITCH WITH DELAY — J/14.9 — 40-030-117264 <br /> 11:044 / 150 SV30-5 WE ISO TAMPER WATERFLOW ISOLATION TAMPER SWITCH — J/14.9 — 40-030-117264 <br /> 11:045 / 151 UV30-2A TAMPER OS&Y SPRINKLER VALVE — G/12.7 — 40-030-1E260 <br /> 11:046 / 152 UV30-2A HI/LO AIR WATERFLOW PRESSURE SWITCH WITH DELAY — G/12.7 — 40-030-1E260 <br /> 11:047 153 UV30-2A WF PSUEDO PANEL POINT (NOT IN FIELD) — NA — NA <br /> 11:048 154 UV30-2B TAMPER OS&Y SPRINKLER VALVE — G/14 — 40-030—lE261 <br /> 11:049 155 UV30-26 HI/LO AIR WATERFLOW PRESSURE SWITCH WITH DELAY — G/14 — 40-030-1E261 <br /> 11:050 156 UV30-213 WF PSUEDO PANEL POINT (NOT IN FIELD) — NA — NA <br /> 11:051 157 ELEV 22 FA DETAIL #1 — SHEET L506-8 — G.3/16.7 — 40-30-1E262 <br /> 11:052 158 ELEV 22 TRBL DETAIL #1 — SHEET E506-8 — G.3/16.7 — 40-30-1E262 <br /> 11:053 159 ELEV 114 FA DETAIL #2 — SHEET E506-8 — A.5/10 — 40-21-1E264 1 / <br /> 054 15F ELEV 114 TRBL DETAIL #2 — SHEET 17506-8 — A.5/10 — 40-21-117264 <br /> 40-30/31 WEST BUILDING FACP POINTS LIST (EVT-EA-40-30/31 n <br /> SCALE: NONE E506 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE FIRE ALARM SYSTEM DETAILS CURRENT REVISION SYMBOL DATE / / <br /> ACCEPTABILITY DRAWN <br /> 08/20/23 30391984 A 08 21 23 <br /> A EVERETT 40-30/31 BLDG FIRE PANEL EXPANSION 30391984 FASDESIGN AGOW/PL 08/21/23 THIS DESIGN AND/OR CITE KE o 08/21/23 sMEET SEQUENCE/ <br /> SPECIFICATION IS APPROVEDTITLE 17506 <br /> BOE, <br /> AE <br /> APPROVED BY DEPT. DATE K.M. 0a 1a 23 EVERET FIRE PANEL REP AGEMENTCHECKED BUILDING 40-031 <br /> APPROVED <br /> APPROVED EVERETT, WA. DWG No. 40-031-17506 <br />