My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST INDEX HALL 2023-12-29
>
Address Records
>
TOWER ST
>
2000
>
INDEX HALL
>
2000 TOWER ST INDEX HALL 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 9:15:26 AM
Creation date
12/1/2023 1:34:09 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
INDEX HALL
Notes
LAWN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i&N66 <br />•R ENGINEERING <br />the difficulty of hand -excavation. In general, CDF having a strength greater than about 100 psi requires <br />power equipment to excavate and should not be used where future hand -excavation might be needed. <br />5.0 ADDITIONAL SERVICES <br />MPE should be retained to review the final design plans and specifications so comments can be made <br />regarding interpretation and implementation of our geotechnical recommendations in the design and <br />specifications. MPE also should be retained to provide monitoring services during site preparations and <br />grading, and other earth -related construction phases of the project. <br />6.0 CLOSURE <br />This report has been prepared for the exclusive use of DAI PS and their consultants for specific <br />application to this project, in accordance with generally accepted geotechnical engineering practices. No <br />warranties, either expressed or implied, are intended or made. Site safety, excavation support, and <br />dewatering requirements are the responsibility of others. In the event that changes in the nature, design, <br />or location of the project as outlined in this report are planned, the conclusions and recommendations <br />contained in this reportshall not be considered valid unless MPE reviews the changes and either verifies <br />or modifies the conclusions of this report in writing. <br />The recommendations presented herein have been developed on the basis of the subsurface conditions <br />encountered during the field investigation and our understanding of the proposed construction. Should <br />changes in the project criteria occur or additional loading information becomes available, a review must <br />be made by MPE to determine if modifications to our recommendations will be required. <br />The analysis and recommendations presented in this report are based upon the data obtained from the <br />hand borings performed at the indicated locations and from other information discussed in this report. <br />This report does not reflect variations that may occur between hand borings, across the site, or due to <br />the modifying effects of construction or weather. The nature and extent of such variations may not <br />become evident until during or after construction. If variations appear, we should be immediately <br />notified so that further evaluation and supplemental recommendations can be provided. We are <br />available to provide geotechnical engineering throughout the design process, and construction and <br />quality assurance monitoring during construction. <br />It is the client's responsibility to see that all parties to this project, including the designer, contractor, <br />subcontractors, etc., are made aware of this report in its entirety. The use of information contained in <br />this report for bidding purposes should be done at the contractors option and risk. Any party other than <br />MP ENGINEERING, PLLC MPGEOTECH.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.