i&N66 <br />•R ENGINEERING <br />the difficulty of hand -excavation. In general, CDF having a strength greater than about 100 psi requires <br />power equipment to excavate and should not be used where future hand -excavation might be needed. <br />5.0 ADDITIONAL SERVICES <br />MPE should be retained to review the final design plans and specifications so comments can be made <br />regarding interpretation and implementation of our geotechnical recommendations in the design and <br />specifications. MPE also should be retained to provide monitoring services during site preparations and <br />grading, and other earth -related construction phases of the project. <br />6.0 CLOSURE <br />This report has been prepared for the exclusive use of DAI PS and their consultants for specific <br />application to this project, in accordance with generally accepted geotechnical engineering practices. No <br />warranties, either expressed or implied, are intended or made. Site safety, excavation support, and <br />dewatering requirements are the responsibility of others. In the event that changes in the nature, design, <br />or location of the project as outlined in this report are planned, the conclusions and recommendations <br />contained in this reportshall not be considered valid unless MPE reviews the changes and either verifies <br />or modifies the conclusions of this report in writing. <br />The recommendations presented herein have been developed on the basis of the subsurface conditions <br />encountered during the field investigation and our understanding of the proposed construction. Should <br />changes in the project criteria occur or additional loading information becomes available, a review must <br />be made by MPE to determine if modifications to our recommendations will be required. <br />The analysis and recommendations presented in this report are based upon the data obtained from the <br />hand borings performed at the indicated locations and from other information discussed in this report. <br />This report does not reflect variations that may occur between hand borings, across the site, or due to <br />the modifying effects of construction or weather. The nature and extent of such variations may not <br />become evident until during or after construction. If variations appear, we should be immediately <br />notified so that further evaluation and supplemental recommendations can be provided. We are <br />available to provide geotechnical engineering throughout the design process, and construction and <br />quality assurance monitoring during construction. <br />It is the client's responsibility to see that all parties to this project, including the designer, contractor, <br />subcontractors, etc., are made aware of this report in its entirety. The use of information contained in <br />this report for bidding purposes should be done at the contractors option and risk. Any party other than <br />MP ENGINEERING, PLLC MPGEOTECH.COM <br />