Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br />Permit #: B2203-037 <br />Additional Notes: <br />Project Address: 2000 TOWER ST <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: NEW 730 SQFT CANOPY, ECC- INDEX LAWN <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: THAD NEWPORT Date: 6/11/2022 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />lReviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2203-037 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />738 SF <br />Stormwater System Dev Fee: <br />$197.64 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PWXXXX-XXX Type of Construction: Existing Development Adding <br />New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />