Laserfiche WebLink
Element 12. Manage the Project: <br />is BMPCISO: Materials On Hand <br />❑ BMPCIW:CeniBed ErosionandSedimentContfulLead <br />(CESCLnot required on -site for sites<Iacre) <br />❑ BMP C162:Scheduling <br />❑ OtWrPertheSWMMWW: <br />❑ Notapplicable to my proposed project <br />Explain: <br />Element 0. Protect low impact development: <br />❑ BMP C102: BuHer3ones <br />® BMP C103: High Visibility Plastic or Metal Fence <br />❑ BMP C200: Interceptor Dike and Swale <br />❑ BMP C207: CheckDams <br />❑ BMP C208: Triangular Slit Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: Brushgarrier <br />❑ BMP U33 SIItFence <br />❑ BMP C 234: Vegetated Strip <br />❑ OtherkttheSWMMWW: <br />❑ Not applicable to myproposed project <br />Task 3: Construction SWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESL) plan for your project. <br />vp <br />Of Show on yourTESC Plan all BMPs selected alternate sadsfythe 13 Elements an your <br />TESCPIan. <br />® See City of Everett Public Works Standard Ran 103-TESC Plan Example <br />everettwe vov/DocumentcentW/ylew/ao4o <br />Note: Conslruclion St r walerPollutionPmventionPlans(Consirwtim SWPPP8)that <br />inwf eengineerOgcaicuiatimuinuslbepreparedbyorunderthodirectionofa <br />Washington Stale professional llcensedengbmer. <br />GSY of Evw wI Puaka Warke <br />CmaMa Wn Slamwahr Po1Wbn ProveMlm Plan <br />(sWPPPJ Template Nr anwl ageca <br />6 of <br />