My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9916 2ND AVE SE 2023-12-06
>
Address Records
>
2ND AVE SE
>
9916
>
9916 2ND AVE SE 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 9:43:19 AM
Creation date
12/1/2023 2:51:23 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
9916
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIII® <br />Le CITY OF EVERETT <br />EVERETT Permit Services <br />WASHINGTON <br />Construction Stormwater Pollution Prevention Plan (SWPPP) for <br />Single Family Residential / Duplex / Small Projects <br />This Small Project Construction Stormwater Pollution Prevention Plan (SWPPP) provides a simplified <br />template to assist small projects In meeting the City of Everal erosion and sedimentation control <br />requirements. <br />This template is for Projects not triggering a drainage report (installing less than 21IDasf of new plus <br />replaced hard surfaces in the separated stormwater basins), as projects that do trigger a drainage report <br />will have a SWPPP section included within the drainage report. <br />rl <br />Project name: Ikebara Backyard Concrete (Pad <br />Project address 9916 2nd Ave SE <br />I Permit number: <br />�,%F'�.Ss�k4 <br />P�tj�fi,V".�t'ti!�r.. JiP��'e� , i <br />4445i`���'.",JF��••H.S <br />Prepared by: Karlae Ikebara baba' <br />3l14/2022 <br />Primary wntaR name: <br />Primary contact phone: <br />Karlae lkebere <br />Primary contact emade kerlee.ikebere@l7mail.com <br />N<umdlerrnverrwren nuM< WITH Mrewrsamp I <br />Construction Stormwater Pollution Prevention Plan (SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and otherpollutants into receiving waters.AConstruction Stormwater Pollution Prevention Plan <br />(Construction SW PPP) is designed to he stand-alone document that addresses construction stormwater <br />managementmnmrns.ACoWofthlsSWPPPIsrequiredto bekeptbytheeontmoorperformingtheworkat <br />the jobsite for reference and updated during the duration of construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.