Laserfiche WebLink
r <br /> 0 0 <br /> Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br /> All new develo mentand redevelopment pro ects ar responsible for preventingerosionandsedimentation <br /> during construction.Each ofthe 13 requirements below contains a list of Best Management Practices(BMPs) <br /> that are accepted by the Washington State Departmentof Ecology(Ecology)for satisfying each requirement. <br /> The BMPs below are the most common.For a complete selection of BMPs please see Volume II of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> 0 Each of the 13 Elements below must be considered in the SWPPP. Select all <br /> BMPsthatyou will be usingto satisfy each requirement.All requirements must <br /> have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> ❑ BMP C101:Preserving Natural Vegetation <br /> ❑ BMPC102:Buffer Zones <br /> 8 BMP C103:High Visibility Plastic or Metal Fence <br /> El Other PertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 2. Establish construction: <br /> B BMP C105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C106:Wheel Wash <br /> ❑ BMP C107:Construction Road/Parking Area Stabilization <br /> ❑ Other PertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 3. Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C240:SedimentTrap <br /> ❑ BMP C241:TemporarySediment Pond <br /> ❑ OtherPertheSWMMWW: <br /> 8 Not applicable to my proposed project <br /> Explain: No water flow is expected <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan <br /> (SWPPP)Template for Small Projects 3 of 6� <br />