My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6527 TYEE RD 2023-12-27
>
Address Records
>
TYEE RD
>
6527
>
6527 TYEE RD 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 11:39:32 AM
Creation date
12/4/2023 11:39:31 AM
Metadata
Fields
Template:
Address Document
Street Name
TYEE RD
Street Number
6527
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2209-036 Description: Redoing underground drains and water <br /> Applied:9/26/2022 Approved:9/28/2022 Site Address: 6527 TYEE RD <br /> Issued:9/29/2022 Finaled: City,State Zip Code: EVERETT,WA 98203 <br /> Status:ARCHIVED-NOT FINALED Applicant: David Perez <br /> Parent Permit: Owner: MARIN CRHISTIAN C&OLIVER JULIANA L <br /> Parent Project: Contractor: PEREZ PLUMBING INC <br /> Details: <br /> NA <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02- JASON CORRECTION <br /> 9/30/2022 9/30/2022 GROUND MORRISSEY REQUIRED <br /> WORK/SLAB <br /> Notes: <br /> -Bring 3"end of line clean-out to above floor for access.(Area of AW and Utility sink.)Per chapter 7 2018 UPC-Install clean-out downstream from <br /> backwater valve.-Replace 3 by 2"low heel San tee under upstairs toilet flange with approved 3"90 per chapter 7 2018 UPC.-Replace slip joint waste <br /> and overflow on upstairs bathroom tub with solvent weld waste and overflow for concealment in ceiling or provide access panel.Per 2018 UPC <br /> 9/30/2022 9/30/2022 PLUMB 03-ROUGH JASON PARTIAL <br /> IN MORRISSEY APPROVAL <br /> Notes: <br /> EDUARDO...M3PEREZ@LIVE.COM <br /> -Underground DWV ok.*** Leave area of end of line clean-out,backwater valve,upstairs toilet and tub exposed till corrections are completed and pass <br /> inspection. <br /> PLUMB 02- JASON <br /> 10/5/2022 10/5/2022 GROUND MORRISSEY APPROVAL <br /> WORK/SLAB <br /> Notes: <br /> -Under slab DWV ok. <br /> 10/5/2022 10/5/2022 PLUMB 03-ROUGH JASON APPROVAL eTRAKiT Inspection Request <br /> IN MORRISSEY <br /> Notes: <br /> 10/4/2022 7:36 AM David Perez <br /> Contact Name:David Perez <br /> Site Address:6527 TYEE RD <br /> Phone:2532172816 <br /> e-Mail:jessica@perezplumbinginc.com <br /> -Portions of old copper DWV replaced with ABS above slab up to basement ceiling.Ok. <br /> I <br /> Printed: Monday,04 December, 2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.