My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2025-08-19
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 10:27:54 AM
Creation date
12/4/2023 1:08:09 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Time Oil Gas Station <br /> ----- <br /> 40 Location of Transformers Dry Kiln ------1 <br /> CY) o ------- <br /> ------ ---- <br /> ----------------- ------- --- ------------------------ ------- <br /> TP-5 <br /> . ....... ........ <br /> TP-1 <br /> ------------ <br /> ---- --- 38.2 ----------------- <br /> ------------------- --- ------ ----- <br /> --- ------------ TP-17 -------------- <br /> Green Storage Shed A <br /> -------- - 60-------:-------- <br /> mw-1 <br /> ------------------------ <br /> ------- ---------------- <br /> B-1 ------------- ----------- <br /> ------------- <br /> L <br /> Office,, <br /> CD <br /> X" X� Storage Unit <br /> ----------60 ------ I <br /> TP-115 '0 1� <br /> ------- ------------- TP-18 <br /> --------- Remedial Excavation Area 2 -------------- 3rOTP-16 Remedial Excavation Area 1 1 <br /> - ------------------- <br /> TP-11 B-5 • <br /> Planer and Dry Shed <br /> ilk <br /> Dry Kiln <br /> P-19 <br /> ` 111`I <br /> Logi,,Storage ------ ------------------ <br /> TP-6 <br /> Ia -- --------- _*TP-3t 60 <br /> TP-25 B-10 X <br /> TP 28 1 <br /> ` ;� <br /> TP-36 <br /> I--------- TP-4 <br /> -B-4 <br /> TP- <br /> C� <br /> -------------- 11------ <br /> -------------- <br /> *TP-29 TP-37 P-2 TP-30 'I L- I <br /> --- ------------- <br /> CN <br /> --------- TP-20 <br /> TIP-2 -------- <br /> -E t 'Sawmill Building '0 <br /> lecfrical Vault TP-35 <br /> ------------------------------- <br /> I II MW-6 -----------0 o. <br /> -000 Aproximte lignment <br /> TP-22 <br /> 0 P B-9 TP-327.1 TP 34- ofpFormer aRailAroad Spur <br /> B-3 B-2 <br /> 66 <br /> Location of Sump Removed <br /> During Cleanup Action <br /> li MW-2 9\\ <br /> Note 3 Approximate location of Sump <br /> - Boiler Room and Shop <br /> 2 <br /> lo <br /> - - = <br /> 0 <br /> om oo <br /> 3: Reserve Fuel Storage <br /> .............. <br /> Lr <br /> cl) <br /> 2 S27.1 MW-30 ...... • Pallet Stock Production Area <br /> c:>1 <br /> o o'J"d <br /> cl) o <br /> o <br /> oo <br /> o <br /> Notes: Legend <br /> o1. The locations of all features shown are approximate. <br /> - <br /> 1 2. This drawing is for information purposes.It is intended to assist in showing features Subject Property Boundary MW-1 0 Approximate Location of Groundwater Compliance Monitoring Well <br /> o <br /> discussed in an attached document.GeoEngineers,Inc.cannot guarantee the <br /> accuracy and content of electronic files.The master file is stored by GeoEngineers, <br /> Inc.and will serve as the official record of this communication. Limits of Sump Excavation 27.1 Groundwater Elevation(feet) CC Site Plan and Groundwater Elevations <br /> 3. Monitoring well MW-2 was excluded from the interpretation of groundwater contours <br /> Final Limits of Remedial Excavation —28.0— Inferred Groundwater Contour(feet) <br /> due its screened interval in a perched,intermittent groundwater zone which is not January 13, 2021 <br /> o <br /> 2 considered to be representative of the groundwater elevation at the Site. <br /> 3: Approximate Location of Historic Mill Feature Inferred Groundwater Flow Direction Z <br /> I�D Former Smith Street Sawmill <br /> co Data Source: Background survey from David Evans and Associates dated 09/14/17. <br /> o Historic Buildings raster image created from sketch provided by City of Everett Public <br /> 113-1 Approximate Location of RI Boring RI=Remedial Investigation Everett, Washington <br /> Works dated 03/10/05. rr <br /> oo <br /> o TP-:L Approximate Location of RI Test Pit <br /> Vertical Datum:NAVID 88. <br /> 40 0 40 GMENGINEER Figure 5 <br /> (o <br /> o, Projection: NAD83 Washington State Planes,North Zone,US Foot. <br /> Feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.