Laserfiche WebLink
APPENDIX D <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE2 <br /> This appendix provides information to help you manage your risks with respect to the use of this report. <br /> Read These Provisions Closely <br /> Some clients, design professionals and contractors may not recognize that the geoscience practices <br /> (geotechnical engineering, geology and environmental science) are far less exact than other engineering <br /> and natural science disciplines. This lack of understanding can create unrealistic expectations that could <br /> lead to disappointments, claims and disputes. GeoEngineers includes these explanatory "limitations" <br /> provisions in our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how <br /> these "Report Limitations and Guidelines for Use" apply to your project or site. <br /> Environmental Services Are Performed for Specific Purposes, Persons and Projects <br /> This report has been prepared for the exclusive use of the City of Everett, their authorized agents and <br /> regulatory agencies. This report is not intended for use by others, and the information contained herein is <br /> not applicable to other sites. <br /> GeoEngineers structures our services to meet the specific needs of our clients. For example, an <br /> environmental site assessment or remedial action study conducted for a property owner may not fulfill the <br /> needs of a prospective purchaser of the same property. Because each environmental study is unique, each <br /> environmental report is unique, prepared solely for the specific client and project site. No one except the <br /> City of Everett should rely on this plan without first conferring with GeoEngineers.This report should not be <br /> applied for any purpose or project except the one originally contemplated. <br /> This Environmental Report Is Based on a Unique Set of Project-Specific Factors <br /> This report applies to the former Smith Street Sawmill Property located in Everett, Washington. <br /> GeoEngineers considered a number of unique, project-specific factors when establishing the scope of <br /> services for this project and report. Unless GeoEngineers specifically indicates otherwise, do not rely on <br /> this report if it was: <br /> ■ Not prepared for you, <br /> ■ Not prepared for your project, <br /> ■ Not prepared for the specific site explored, or <br /> ■ Completed before important project changes were made. <br /> If important changes are made after the date of this remedial action plan, GeoEngineers should be given <br /> the opportunity to review our interpretations and recommendations and provide written modifications or <br /> confirmation, as appropriate. <br /> 2 Developed based on material provided by GBA,GeoProfessional Business Association;www.geoprofessional.org. <br /> GEOENGINEER� January 24,2022 1 Page D-1 <br /> File No.0661-108-03 <br />