Laserfiche WebLink
• <br /> Department of Ecology—Katelynn Piazza,SEPA Coordinator <br /> 1. There are five cleanup sites within 750 feet of the project.The applicant should consult <br /> Ecology's"What's in my Neighborhood?"database(httrs://apps.ecologv.wa.gov/neighborhood/)to <br /> see if any of those sites may impact their project. <br /> Thank you for considering these comments from Ecology. If you have any questions or would like to <br /> respond to these comments,please contact Sandra Matthews from the Toxics Cleanup <br /> Program at(425)649-7206 or by email at sandra.matthews@ecv.wa.gov. <br /> PSE—Patrick Robinson—425.424.7498 <br /> 1. Puget Sound Energy has high pressure natural gas main running east/west along the 36th St corridor. <br /> This main was relocated in 2015 and does not match the site plan document provided under SEPA19- <br /> 015 on the City of Everett Online Permitting Portal.. <br /> 2. Please contact Mardy Putney, PSE PI Inspector,at(425)754-8053 with a confirmed date of <br /> excavation and/or confirmed excavation boundary so that he may be on site if necessary <br /> 3. You may request a map of our infrastructure at this location by emailing MapRequest@pse.com. <br /> If you have additional questions regarding the above comments, please contact me at(425)424-7498 <br /> or at Patrick.Robinson@pse.com. <br /> 1611 <br /> fi <br /> Jl <br /> Page 5 of 5 <br /> SEPA19-015 <br /> EVERETT <br />