Laserfiche WebLink
On Nov 20, 2023, at 8:52 AM, Audrey Arbow <br /><AArbow@everettwa.gov> wrote: <br />Category 2: Sensitive information <br />Good morning, <br />Thank you for your permit application at the property <br />listed in the subject line. Before we can move forward <br />with approvals, there are two additional items <br />required. First, since this is a heat pump installation, <br />can you please provide a site plan showing where the <br />outdoor unit is being installed and how many feet from <br />the property line it will be? <br />Second, we require an associated electrical permit to <br />be applied for to permit the associated electrical <br />alterations required to add a heat pump. This is a <br />requirement even for a disconnect/reconnect. If your <br />company has an electrical license, please apply for the <br />electrical permit online through our permitting portal. <br />Otherwise, you will need to have your electrical sub- <br />contractor apply for their own permit before we can <br />approve your application. <br />If you have any questions, let me know and I'll be <br />happy to help. <br />Take care, <br />