Laserfiche WebLink
Intake &Approval Sheet iFOR PERMIT STAFF ONLY) PERMIT# E © S""0' <br /> BUILDING FaINING <br /> Intake OK by: Date: intake OK by: Assign To: Date: <br /> intake Comments: Intake Comments: <br /> Zone 1 1 ►U <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use 1Z J t- <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bidg/TllAddn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size PIanning/Landscape inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement El No ❑Yes, Fin/Unfin School Impact Fee: Total $ / <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group 3 ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers:,Update Existing ONew System ❑Not Req'd Park Impact Fee Total$ / (net clue after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: / lpdate Existing :New System ONot Req'd Permit Technician Use Only:Apply Phase-In Credit Per ENIC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit-issued 1/1/2022-9/2/2022 <br /> ROW 64.55 MF worksheet req'd for permit? ❑Yes 12 No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I ROW 64.55 does required prior to final? ❑Yes No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$3;OOc>,bD Additional Notes: <br /> ( f 1Ql <br /> Approved By: Date: <br /> PUBLIC WORKS . . . <br /> Additional Notes: intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if <br /> Qsys Dev Eval(Util/sw) ❑Traffic Mit Eval <br /> Approved B Date:Q6/Z. 7�2� ❑Site Work/Drainage 1_7Address Letter <br /> I QBackflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate!Deferred Submittals Required: ❑Route this folder for PW Review at end --PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> 0 This Permit is Approved by Public Works <br /> Fire Dept.Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW <br /> Minimal or No Fire Scope-NO FIRE FEEL AND ❑ Is located in this folder <br /> !.a eeti n Coop ",^D F:RE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By:\.<‘9 1Y7 Date: 6— 7 2 ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Public Works has no scope--PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: vc (1A1_ -e, ©& <br /> Approved By: Date: Completed By:- (_J D e: 0 it 10Z 26t.3 <br />