My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2609 LOMBARD AVE B 2023-12-07
>
Address Records
>
LOMBARD AVE
>
2609
>
2609 LOMBARD AVE B 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:42:46 PM
Creation date
12/7/2023 3:41:52 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2609
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 2.. 17-/015/7-e !A <br /> 2609 B Lombard (attic & floor = R19, all double-pane windows) <br /> WORK for inspection: <br /> 1. Remove walls that were separating living,dining , and garage. <br /> 2. Remove poorly installed 5' wide window. Rebuild wall w/ plywood, 2x4's, <br /> 4" penny nails, R-13 wall insulation, Tyvek exterior sheeting, (likely tar <br /> paper exterior to that), side with cedar shake siding, shim (with plywood) wall <br /> interior to match wall depth, drywall. <br /> 3. Hard wire in 4 smoke alarm upstairs, and one smoke alarm in garage. <br /> All on its own breaker. Wiring diagram NYA. Use press-on <br /> connectors or nuts, 12 awg romex, secure wire every 2' with yet determined. <br /> 4. Rebuild 2 of the 3 attic entrances back into ceiling. NYA, but likely screw/nail <br /> 2 x 4's to sides of entrance, re-floor that section of the attic crawl space w/ <br /> plywood, and sheetrock ceiling. <br /> 5. Install 8" x 8" x .7' post in approx. center of garage, centered where 2 <br /> North-South beams meet to support structure. Use SC88 top plate & AAE88L <br /> raised base. Bore 2 -5/8" holes in concrete to tap in 5/8" anchor bolts, <br /> place weights then washers over bolts, secure with nut, place raised platform <br /> down, put beam in place, top plate in place, load weight on beam and secure <br /> plates with 1/8" or 3/16" 2.5" nut drives. <br /> 6. Plumb in dishwasher, by tapping off yet-unseen copper going to the sink. <br /> Install turn-off valve. Hard wire in dishwasher 14awg. <br /> 7. Install NYA used vented microwave over NYA 24" or 20" stove. B-vent (3-4" w/cap) <br /> (100-300cfm exhaust out through roof, boot at roof. Install a cabinet above. <br /> 8. In 7' x 3' space, add sink and put toilet back in. Build walls to R15 for bath, <br /> ceiling R49, floor height 6" insulated R49. This leaves full 18'6" for parking space. <br /> 9. Install/modify cabinets into kitchen (incl over fridge, stove, washer, and sink). <br /> 10. NEW! Move bath, sink. & toilet. Frame in bathroom NE wall. rebuild floor, add closet, <br /> laundry shoot, frame in new bath & 45° bed door, move NE bed wall 4" S. Kitch island. <br /> 11. Venting a fan in bathroom 50cfm (garage already has fan in jr= <br /> 12. Possibly replace posts that were under upstairs overh <br /> DEC0g2011 <br /> 13. Wash/dry w/4 prong cord, plumbed, vented. Details NY <br /> Clry OF E\./EBE T T <br /> l 9 2 0IQ 2_ Pon-nitSalvoes <br />
The URL can be used to link to this page
Your browser does not support the video tag.