My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2609 LOMBARD AVE B 2023-12-07
>
Address Records
>
LOMBARD AVE
>
2609
>
2609 LOMBARD AVE B 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:42:46 PM
Creation date
12/7/2023 3:41:52 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2609
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
izi <br /> Permit Inspections <br /> V E R E T T city of Everett <br /> WASHINGTON <br /> 6/17/2014 6/17/2014 Consultation TED DE BUDDEN PartialApproval Progress inspection <br /> Notes: <br /> 11/15/2016 11/15/2016 GasPiping DAROLD WALDEN Approval See notes <br /> Notes: <br /> Yellow tracing wire required in ditch outside required cap all gas pipe <br /> 11/17/2016 12/13/2018 Consultation DAVE FOSTER Status-progress B unit-see notes <br /> Notes: <br /> Stairway-maximum spacing 4"or<, <br /> Handrailing/guard railing installed. <br /> 5/2/2017 5/2/2017 Framing DAVE FOSTER PartialApproval See notes <br /> Notes: <br /> Stiarway handrailing interior installed OK. <br /> 10/16/2017 10/16/2017 Consultation DAVE FOSTER Other See notes for progress status <br /> Notes: <br /> South side of garage filled in window with concrete. <br /> 4/11/2018 4/11/2018 BLDG DAVE FOSTER OTHER See notes <br /> CONSULTATION <br /> Notes: <br /> Installed air seal <br /> attic access covers-ceiling <br /> Status inspection. <br /> 4/11/2018 4/11/2018 GAS 01-ROUGH IN DAROLD WALDEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Retest gas pipe in building A&B and replace coupling in building A in crawl. <br /> 5/2/2018 5/2/2018 GAS 01-ROUGH IN DAROLD WALDEN APPROVAL 15 PSI <br /> Notes: <br /> 5/8/2018 5/8/2018 GAS 01-ROUGH IN DAROLD WALDEN APPROVAL Gas valves on piping tested 15 PSI <br /> Notes: <br /> 11/1/2018 11/1/2018 BLDG 11- DAVE FOSTER OTHER See notes <br /> INSULATION <br /> Notes: <br /> Status or work-Air seal(insulation). <br /> 4/24/2019 4/24/2019 BLDG 11 DAVE FOSTER PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> Attic access covers-air seal installed <br /> :4' <br /> Printed:Tuesday, 10 October,2023 2 of 4 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.