Laserfiche WebLink
izi <br /> Permit Inspections <br /> V E R E T T city of Everett <br /> WASHINGTON <br /> 6/17/2014 6/17/2014 Consultation TED DE BUDDEN PartialApproval Progress inspection <br /> Notes: <br /> 11/15/2016 11/15/2016 GasPiping DAROLD WALDEN Approval See notes <br /> Notes: <br /> Yellow tracing wire required in ditch outside required cap all gas pipe <br /> 11/17/2016 12/13/2018 Consultation DAVE FOSTER Status-progress B unit-see notes <br /> Notes: <br /> Stairway-maximum spacing 4"or<, <br /> Handrailing/guard railing installed. <br /> 5/2/2017 5/2/2017 Framing DAVE FOSTER PartialApproval See notes <br /> Notes: <br /> Stiarway handrailing interior installed OK. <br /> 10/16/2017 10/16/2017 Consultation DAVE FOSTER Other See notes for progress status <br /> Notes: <br /> South side of garage filled in window with concrete. <br /> 4/11/2018 4/11/2018 BLDG DAVE FOSTER OTHER See notes <br /> CONSULTATION <br /> Notes: <br /> Installed air seal <br /> attic access covers-ceiling <br /> Status inspection. <br /> 4/11/2018 4/11/2018 GAS 01-ROUGH IN DAROLD WALDEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Retest gas pipe in building A&B and replace coupling in building A in crawl. <br /> 5/2/2018 5/2/2018 GAS 01-ROUGH IN DAROLD WALDEN APPROVAL 15 PSI <br /> Notes: <br /> 5/8/2018 5/8/2018 GAS 01-ROUGH IN DAROLD WALDEN APPROVAL Gas valves on piping tested 15 PSI <br /> Notes: <br /> 11/1/2018 11/1/2018 BLDG 11- DAVE FOSTER OTHER See notes <br /> INSULATION <br /> Notes: <br /> Status or work-Air seal(insulation). <br /> 4/24/2019 4/24/2019 BLDG 11 DAVE FOSTER PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> Attic access covers-air seal installed <br /> :4' <br /> Printed:Tuesday, 10 October,2023 2 of 4 <br /> SUPERION <br />