My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1712 W MARINE VIEW DR 2023-12-07
>
Address Records
>
W MARINE VIEW DR
>
1712
>
1712 W MARINE VIEW DR 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:18:39 PM
Creation date
12/7/2023 4:18:08 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1712
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# p JQ ( '"O'o <br /> mor <br /> BUILDING TANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg1TI/Addn/Rem Size Total No. of Dwelling Units: <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not.Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New System ONot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add i RCW 64.55 docs required prior to final? ❑Yes ❑No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional Notes: <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> ❑Sys Dev Eval(Util/sW) DTraffic Mit Eval <br /> Approved By: Date: ❑Site Work/Drainage DAddress Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: ❑Route this folder for PW Review at end --PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ODeferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder coin with this folder for permit issuance) <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved B� ate:,2/2/2 3 Completed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.