Laserfiche WebLink
CITY uF EVERETT <br />EVERETT <br />WASHINGTON Permit Services Transmittal <br />PERMIT/PROJECT #: B2310-029 <br />SITE ADDRESS: 9502 18TH AVE W UNIT L EVERETT <br />PROJECT NAME: HARRISON POINTE <br />OFFICE USE ONLY <br />Date ReceivedStamp <br />(e E !! <br />N O V ii 9 2023 <br />CITY OF EVERETT <br />FROM: RHONDA CLANCY COMPANY: PACIFIC RIDGE HOMES ❑ Chronolo gy —Permit Counter Transmittal <br />PHONE #: 425.939.1164 ❑ Plan Review Routing <br />EMAIL: RLCLANCYcrDRHORTONCOM <br />Location: []File []Reviewer Office <br />Date Logged: By: <br />Route to: (Check all that apply) Name of Reviewer <br />Type of Review <br />© Planning Reviewer Name: <br />❑ Re -Review <br />❑ Public Works Reviewer Name: <br />✓❑ Building <br />❑ Revisions After Approval <br />Reviewer Name: <br />❑ Fire <br />❑Revisions After Is <br />Reviewer Name: <br />© Other <br />El Other <br />Reviewer Name: CINDY BERGSMA <br />❑ Other <br />Provide quantities for all items submitted <br />PLANS <br />REPORTS/CALCULATIO NS <br />OTHER DOCUMENTS <br />Qty <br />QtY <br />Qtv <br />Architectural/Building Plans <br />_ Geotechnical Report <br />_ Correction Letter Responses <br />Structural Plans <br />_ Drainage Report <br />_ Draft Easement <br />Civil Plans <br />_ SWPPP Report <br />_ Recorded Easement <br />Site Plan <br />_ Wetland Report <br />_ Height Survey <br />Landscape Plan <br />_ Critical Area Report <br />_ Base Elevation Survey <br />Survey <br />Traffic Stud TDM Report <br />— Y/ p <br />_ Critical Area Covenant <br />— Elevations <br />_ Structural Calculations <br />_ Stormwater Covenant <br />Floor Plans <br />— Height Calculations <br />_ Covenant - Other <br />Special Inspection Report <br />_ Plumbing Calculations <br />_ Performance Guarantee <br />As-Builts <br />_ Other <br />_ Warranty Bond <br />Plat Maps <br />— Other <br />_ Other <br />Original City Redlines Returned <br />_ Other <br />_ Other <br />2 Other Response letter <br />_ Other <br />_ Other <br />2 Other Crawl Space Drain Plan <br />— <br />Other <br />_ <br />Other <br />Items submitted are: <br />© Complete Plan Set Replacement <br />❑ Additional Documents <br />(Slip -sheeting not permitted) <br />(To be added to file) <br />Comments to Reviewer: FOR CHANGES IN SCOPE: <br />2 copies response letter Revised Description of Work: <br />2 copies drain plan <br />Revised Valuation: <br />Signed: Date: 11/7/2023 <br />