My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2821 106TH ST SE 2023-12-11
>
Address Records
>
106TH ST SE
>
2821
>
2821 106TH ST SE 2023-12-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 10:52:45 AM
Creation date
12/11/2023 10:52:35 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SE
Street Number
2821
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lai <br /> Permit Inspections <br /> V E R E T T city of Everett <br /> WASHINGTON <br /> Permit Number: M2001-077 Description:AIR HANDLER CHANGE OUT,ADD HEAT PUMP <br /> Applied: 1/27/2020 Approved: 1/27/2020 Site Address:2821 106TH ST SE <br /> Issued: 1/28/2020 Finaled: City,State Zip Code: EVERETT,WA 98208-4469 <br /> Status:ARCHIVED-NOT FINALED Applicant:<NONE> <br /> Parent Permit: Owner:COLLINS ELAINE A <br /> Parent Project: Contractor: MM COMFORT SYSTEMS <br /> Details: <br /> NOT TO BE INSTALLED IN ANY SET BACKS. <br /> AIR HANDLER CHANGE OUT,ADD HEAT PUMP <br /> Y <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/7/2020 2/7/2020 MECH 06-FINAL DAROLD WALDEN NO ACCESS <br /> Notes: <br /> Brian:757-344-3618 <br /> 11/5/2020 11/5/2020 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 5/10/2021 5/10/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 12/6/2021 12/6/2021 MECH 06-FINAL JASON CORRECTION <br /> MORRISSEY REQUIRED <br /> Notes: <br /> Brian:757-344-3618 <br /> (12/6/2021 9:01 AM JJM) <br /> -Install condensate trap on evaporator coil per IMC. <br /> 8/9/2022 8/9/2022 MECH 06-FINAL BILLY APPLETON CORRECTION <br /> REQUIRED <br /> Notes: <br /> 1.Install locking caps on refer ports on AC unit outside. <br /> 2.Install 3/4"pvc hard cap on tee before condensate trap,no 90's or open pipe. <br /> d <br /> Printed:Thursday, 19 October,2023 1 of 1 i1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.