Laserfiche WebLink
�y i .�i t .ate • �' Y f <br /> GENERAL PROJECT NOTES ` �; v [11r '¢ i4 „4,, _ L;I <br /> • <br /> 1. DO NOT SCALE DRAWINGS. z s y„ ua . a�,17'zs Y � '� r-� ,,,�' . <br /> sue . s ' F CC DESIGN LLC <br /> 2. THIS PROJECT SHALL COMPLY WITH ALL GOVERNING REGULATIONS, : : : �FF :ilz4,4 4,,E, r '` www.ccdesign.us <br /> ORDINANCES, BUILDING CODES, OR COVENANTS OF THE AREA IN WHICH IT IS BUILT. o ' } Tel 206.201.1105 <br /> .--n i j r x e Email:caulkingcc@gmail.com <br /> y :...: # r <<r sip.. <br /> 3. APPROVAL BY AN INSPECTOR DOES NOT CONSTITUTE AUTHORITY TO DEVIATE <br /> FROM THE DRAWINGS OR SPECIFICATIONS. Tl ' , ' µ ;I' V y <br /> lit 4 �Ci ' L d , V 1. I - -__ -:• - -- <br /> 4. THE CONTRACTOR SHALL SCHEDULE WALK-THROUGHS AT EACH OF BELOW yr€I, ' i I 1.1 1 , _ : - _------ 1—` z OC <br /> NOTED INTERVALS: PSI ti.o ` IA�J�• :I a'=; ° '� �.,_ - - - 7, � ��� :. >. Z—� O <br /> A. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ;-`' w —..= - 10 7 <br /> B. PRIOR TO THE COMMENCEMENT OF ALL MECHANICAL + ELECTRICAL ON <br /> !_ �' y '` H <br /> WORK. ''" , I <br /> ' '. ^H <br /> 5. PROVIDE ALL NECESSARY BARRICADES, WARNING SIGNS, + DEVICES TO ~ <br /> PROTECT PUBLIC + CONSTRUCTION PERSONNEL DURING CONSTRUCTION. � �= -- H H <br /> 6. MAINTAIN ALL REQUIRED ACCESS + EGRESS DURING CONSTRUCTION. 124 <br /> [—a PROPOSED STORAGE ROOM <br /> w <br /> 7. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND ALL - -- ,, I : w <br /> MECHANICS SHALL BE SKILLED IN THEIR TRADE. <br /> W <br /> " 8. G.C. SHALL REVIEW, CHECK, AND REPORT STATUS OF ALL SITE CONDITIONS, SITE CONDITION w <br /> EXISTING GRADES, SURVEY AND UTILITIES; AND SHALL VERIFY AND BE p-4 <br /> RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE SITE. IT SHALL BE W <br /> THE RESPONSIBILITY OF THE G.C. TO NOTIFY THE ARCHITECT IMMEDIATELY OF ANY <br /> DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE ACTUAL �) N <br /> FIELD CONDITIONS IN WRITING. ALL QUESTIONS REGARDING SITE CONDITIONS, Z r, <br /> DRAWINGS OR SPECIFICATIONS SHALL BE DIRECTED TO THE ARCHITECT. H 00 <br /> C/) N <br /> N <br /> 9. THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, PATCHING, REPAIRING AS N <br /> REQUIRED TO PERFORM ALL THE WORK INDICATED ON THE DRAWINGS, AND ALL <br /> OTHER WORK THAT MAY BE REQUIRED TO COMPLETE THE JOB. <br /> CLIENT <br /> 10. ALL WIRING SHALL BE REMOVED TO A POINT OF CONCEALMENT AND SHALL BE Dawen Chen <br /> PROPERLY CAPPED OR PLUGGED. 2228 127th PI SE, <br /> Everett 98028 <br /> 11. THE ENGINEER/ARCHITECT OF RECORD SHALL BE NOTIFIED FOR ANY <br /> INSPECTIONS <br /> NO REVISION DATE <br /> 12. ASBESTOS: SHOULD ANY ASBESTOS OR ASBESTOS CONTAINING MATERIAL <br /> (A.C.M.) BE UNCOVERED, IT SHOULD BE REPORTED IMMEDIATELY TO THE OWNER <br /> AND ARCHITECT. THESE CONTRACT DOCUMENTS DO NOT INCLUDE THE REMOVAL <br /> OF ANY ASBESTOS OR A.C.M <br /> 13. CONTRACTOR RESPONSIBEL TO LOCATE ALL EXISTING UNDERGROUND DRAWING TITLE <br /> UTILITIES AND CLEARLY MARK THEM PRIOR TO EXCAVATION AS REQUIRED BY NOTES, SITE <br /> - GOVERNING AGENCIES AND TAKE ALL NECESSARY PRECAUTIONS TO PROTECT INFORMATION <br /> THESE UTILITIES FROM DAMAGES OR DESTRUCTION. CONTRACTOR ALSO <br /> . RESPONSIBLE TO PROTECT ALL ADJOINING PROPERTIES BOTH PUBLIC AND <br /> PRIVATE AND TAKE ALL SAFETY PRECAUTIONS TO PROTECT THE HEALTH, SAFETY SHEET NO <br /> AND WELFARE OF THE IMMEDIATE AREA. G-002 <br />