My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2815 15TH ST BLDG C 2023-12-18
>
Address Records
>
15TH ST
>
2815
>
BLDG C
>
2815 15TH ST BLDG C 2023-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 11:23:50 AM
Creation date
12/11/2023 3:13:38 PM
Metadata
Fields
Template:
Address Document
Street Name
15TH ST
Street Number
2815
Tenant Name
BLDG C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL LETTER REPORT <br />ReportNumber: M7211355.0162C <br />Service Date: 05/31/23 <br />Report Date: 05/31/23 <br />Everett Housing Legacy LLLP <br />Attn: Accounts Payable <br />3107 Colby Ave <br />Everett, WA 98201 <br />City of Everett <br />Building Division <br />3200 Cedar <br />Everett, WA 98201 <br />MAYES I lrercacm <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Everett Housing Legacy LLLP - Baker Heights Legacy <br />2710 14th Street <br />(contractor office: 13M Larch St) <br />Everett, WA <br />Project No.: M7211355 <br />Final Letter <br />Permit No: C2007-006 (Building C) <br />This is to advise you that registered special inspections have been completed for the project referenced above per <br />our reports, copies of which have been sent to you. <br />Special inspection was provided for: <br />Installation of Hold -Down System <br />Lateral Load Resisting Framing <br />Mechanical Anchor Boll Installation <br />Proprietary Anchors <br />Reinforced CMU Masonry <br />Reinforced Concrete —CIP <br />Structural Steel Erection <br />Spray -Applied Fire -Resistive Materials <br />Soil Bearing Verification <br />Soil Compaction <br />To the best of our knowledge, all work inspected was either performed in accordance with, or connected to conform <br />to, the City -approved drawings or Engineer -approved changes. <br />We trust this provides you with the information you require. Should you have any questions, please contact us at <br />425-742-9360. <br />I <br />Michael Mattox <br />Senior Project Field Manager <br />Services: Projectmanagement <br />Mayesrterraccn Rep.: Michael Maeox 70*VLV <br />Reported to: CDK Consrumon Services <br />Contractor: CDK Construction Kevin Graham <br />Report Distribution: Principal / Office Manager <br />See attached distribution list. <br />They t0t5 were preformed in general accordance with reed I rattle ASTµ PASHTO, or OOTtest meNeds. This report Is exclueivelyrw theme of the client <br />Indicated above and shall not be reproduced excepr m full without the written consent dour company. feet results vansmltted haem are only apglwbleto <br />Me actual sxrolea twitted at the Ideal referenced and are not wooduanlv'mdical of the pmpediea 4 other noterently simile or identical braterrals. <br />consent tatata,weto Page 1 of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.