Laserfiche WebLink
Intake►$ Approval Sheet 0 (FOR PERMIT STAFF ONLI) 10 PERMIT # G 11ccn—LJUIp <br />BUILDING <br />Intake OK by: Date: <br />Intake Comments: <br />❑ Route to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />Bldg/TI/Addn/Rem Size <br />18, 83z2 <br />Garage/Accessory Struct. Size <br />— <br />Number of Stories <br />,3 <br />Basement <br />53No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />CIS <br />Fire Sprinklers: ❑Update Existing New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing VINewSystern ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? Yes ❑ No <br />Add'[ RCW 64.55 docs required prior to final? ❑Yes WNo <br />VALUATION CALCULATION: Total $ A OR O 3 6 z- <br />lg <br />Additional Notes: <br />Approved By: Date: 1 b l !2 <br />FIRE DEPARTMENT <br />Separate I Deferred Submittals Required: <br />e Sprinklers 14ire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />Review / Inspection Scope - ADD FIRE FEE <br />Approved By: <br />Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />I � QY1 R %J <br />Planning/Landscape Inspection Required before Final? Yes ❑No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: <br />-► T iJ <br />Approved By: Date: <br />PUBLIC WORKS <br />Intake OK by: Date: <br />..... ...... ........................................._.........._.._.......__._...................._....__............. <br />Intake Comments: DPW Worksheet Needed if: <br />`❑Sys Dev Eval ❑Traffic Mit Eval <br />❑Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />supportive housing) <br />..............-._. ..... ........................................................................_...................................._........... _ <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />TR This Permit is Approved by Public Works <br />e,See PW Review Worksheet and associated attached items <br />A Separate PW Permit is Required (Permit #: PW <br />AND El' Is located in this folder <br />k2l Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ Will be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope --- PW Not Required <br />Additional Notes: <br />{, `�sil� P�J cih gld� �tim�r <br />Approved By: <br />Date: <br />in# <br />