My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sova Construction LLC 12/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
Sova Construction LLC 12/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:53:46 AM
Creation date
12/12/2023 9:53:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sova Construction LLC
Approval Date
12/11/2023
End Date
4/19/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Carl Gipson Center Wall and Window Repair
Tracking Number
0004065
Total Compensation
$47,235.02
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Small Works Contract - 1 <br />SMALL WORKS CONTRACT <br /> <br />THIS CONTRACT is dated and effective as of the date of the Mayor’s signature below and is by <br />and between the City of Everett, a Washington municipal corporation (the “City”), and the Contractor <br />shown below in the Basic Provisions. <br /> <br />1. Basic Provisions: <br />Solicitation Name 2023-091 Carl Gipson Center Wall and Window Repair <br />Brief Description of <br />Work <br />This project is to replace the existing windows in the Carl Gipson Center <br />Director’s office that have been leaking from the sides for several years. <br />Contractor <br />Sova Construction LLC <br />21924 22nd Avenue E <br />Spanaway, WA 98387 <br />acasciato@sovaconstructionllc.com <br />City <br />Project <br />Manager <br />Douglas Acheson <br />City of Everett – Parks & Facilities <br />802 E Mukilteo Boulevard <br />Everett, WA 98201 dacheson@everettwa.gov <br />Contract Time The Work shall be physically complete in all respects within 120 calendar days <br />from the date of issuance of the Notice to Proceed. <br />Contract Price $47,235.02 <br />Contract <br />Documents <br />The following documents (“Contract Documents”) are incorporated by <br />reference and are hereby made a part of this Contract: this Contract <br />document; Invitation for Quote and addenda thereto, including without <br />limitation any Instructions, General Conditions, Specifications, <br />Contractor Commitment and Information, Price Sheet, Certification of <br />Compliance, Minority Business Certification, Contractor References, and <br />any other document included in the Invitation to Quote ; change orders; <br />all provisions required by law, and the following document(s), if any: <br />N/A <br />Contractor’s response to the solicitation is a Contract Document, but only <br />
The URL can be used to link to this page
Your browser does not support the video tag.