My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group LLC 12/8/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
American Process Group LLC 12/8/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 10:40:48 AM
Creation date
12/12/2023 10:40:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group LLC
Approval Date
12/8/2023
Council Approval Date
11/1/2023
End Date
5/31/2024
Department
Public Works
Department Project Manager
Joseph Ferguson
Subject / Project Title
2024 WPCF Biosolids Removal
Public Works WO Number
UT 3826
Tracking Number
0004001
Total Compensation
$1,275,708.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contract (00 5213) - 1 <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, a <br />municipal corporation existing under the laws of the State of Washington (the “City”) and <br />American Process Group LLC (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and/or appurtenances in accordance with the <br />Specifications and Drawings and all other Contract Documents entitled: “UT 3826 2024 WPCF <br />Biosolids Removal” (the “Project”). <br />1.Contract Documents. The “Contract Documents” are defined in the General Conditions. <br />The Contract Documents are part of this Contract and are hereby incorporated by reference. <br />Terms that are capitalized in a Contract Document but not defined in that Contract Document <br />shall have the meaning defined to them in the other Contract Documents. A copy of the <br />Contract Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf <br />and is available as follows: <br />Link <br />to <br />PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1595639&searchid=96bd8 <br />530-3afb-41c5-adb3-13b44a5ea3eb&dbid=0 <br />This is a 307-page pdf digitally signed by City of Everett 2023.10.31 10:17:17-07’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted Contract <br />Documents as of the Bid Opening Date. City and Contractor further agree that this pdf may <br />contain some other documents (such as Reference Information) that are not Contract <br />Documents. <br />2.Contract Time. Substantial Completion of the Work shall be achieved within sixty (60) <br />calendar days after the effective date of the Notice to Proceed. Physical Completion shall be <br />within thirty (30) calendar days after the actual date of issuance of Substantial Completion. <br />3.Liquidated Damages. The parties agree the City will suffer damage and be put to <br />additional expense in the event that the Contractor does not complete the Work in all respects <br />and have it ready for use by the Substantial and Physical Completion dates stated above. <br />Because it is difficult to accurately compute the amount of such costs and damages, the <br />Contractor hereby covenants and agrees to pay to the City liquidated damages for each and <br />every calendar day (or working day, if Contract Time is described in working days) in the <br />amounts set forth in this Section. For failure to achieve Substantial Completion by the <br />Substantial Completion date stated above, the Contractor shall pay liquidated damages to the
The URL can be used to link to this page
Your browser does not support the video tag.