My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/12/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/12/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 8:51:43 AM
Creation date
12/13/2023 5:03:11 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />-5- <br /> <br /> <br /> <br /> (a) Whether such poles are available for the Licensee’s Equipment; <br /> <br /> (b) Whether, in order to accommodate the attachment of Equipment of <br />Licensee, any rearrangements or other changes are necessary to the facilities of the <br />Licensor or the facilities of other joint users of the poles in question; <br /> <br /> (c) Whether any poles in question require strengthening (guying and <br />anchoring) in order to support the attachment of Licensee’s Equipment; <br /> <br /> (d) Whether any poles require replacement by taller or stronger poles in order <br />to support the attachment of Licensee’s Equipment; and <br /> <br /> (e) Whether any vegetation management and/or tree trimming is required. <br /> <br />The administrative and engineering review shall include an engineering estimate of the <br />costs of performing those items described in subsections (b), (c), and (d) of this Section. <br />Such engineering estimates shall constitute “make-ready work” within the meaning of <br />Section 2.04. <br /> <br />Licensor shall review each application submitted by Licensee for completeness and shall <br />notify Licensee whether said application is complete or incomplete within forty-five (45) <br />days of receipt of the application. If incomplete, the notice shall describe what information <br />is needed to make the application complete. Licensee shall have forty-five (45) days (or <br />longer as determined by Licensor) to submit any missing information and complete any <br />action(s) described in the notice of incompleteness. If Licensee fails to provide such <br />information or complete such action(s) within the required time period, Licensor may reject <br />the application and retain the Application Fee. <br /> <br />Within sixty (60) days of an application being deemed complete, Licensor shall notify the <br />applicant as to whether the permit application has been accepted or rejected. In <br />extraordinary circumstances, and with the approval of the applicant, the Licensor may <br />extend the sixty (60) day timeline. If the application is rejected, the Licensor shall provide <br />Licensee with the reasons for the rejection and such reasons shall be in accordance with <br />this Agreement and applicable state and federal law. <br /> <br />2.04 Make Ready Work <br /> <br />The phrase “make-ready work” shall include those items described in subsections 2.03(b), <br />(c), (d), and (e) above. <br /> <br /> (a) Make Ready Assessment. Upon completion of the review under Section <br />2.03, Licensor agrees to notify Licensee as to which of the poles in question are available <br />for the Licensee’s Equipment, including the exact location on the poles available or which <br />will be available for attachment of Licensee’s Equipment. Licensor further agrees to notify <br />Licensee as to the make-ready work which will be required in order to accommodate <br />attachment of the Licensee’s Equipment, including an estimate of the costs of such make- <br />ready work. The Licensor agrees to consider any reasonable objections or comments made
The URL can be used to link to this page
Your browser does not support the video tag.