Laserfiche WebLink
Permit Inspections <br />VERETT City of Everett <br />WAAHIMATnN <br />BLDG 09-FIRE <br />5/10/2022 <br />5/10/20D <br />STOPPING/BLOCKIN <br />KURT KECK <br />NOT READY <br />Remove insulation for inspection <br />G <br />Notes: <br />5/9/20228:12 AM C D K CONST SERVICES INC <br />wes would like a re-ini for fire stopping on I.I. Point of canal Kyle Kussman DOES CR 01 <br />Contact Name: C D K CONST SERVICES INC <br />Site Address: 272515TH ST BLDG B <br />Phone: 4257BM41 <br />e-Mail: rcoreydacdkmnstruction.wm <br />5/10/2022 <br />5/10/2022 <br />BLDG 10 DRYWALL <br />KU IT KECK <br />NOT READY <br />eTRAKIT Inspection Request <br />NAILING <br />Notes. <br />518:14AM C D K CONST SERVICES INC <br />We would like a nailing Inspection for L3 and US. Point of contact Kyle Kussman 206472030C <br />Contact Name'. C D K CONSTSERVICES INC <br />Site Address: 272515TH 5T BLDG B <br />Phone : 0257888001 <br />e4vt rcoreylccdkconstrudion orm <br />5/10/2022 <br />5/10/2022 <br />BLDG 12 <br />KURT KECK <br />CORRECTION <br />See notes <br />INSULATION <br />REQUIRED <br />Notes: <br />519/20228:15 AM C D K CONST SERVICES INC <br />We would like an insulation inspection on Ll. Point of contact: Kyle Kussman 206 472 03M <br />Contact Name: C D K CONSTSERVICES INC <br />Site Address: 272515TH 5T BLDG B <br />PM1one: 4252888441 <br />e-Mall: rcoreykcdkconstructlpr.com <br />(5/10/20223:24 PM KMK) <br />Fire blocking inspection not completed Remove insulation for inspeRion. <br />BLDG 09-FlRE <br />5/11/2022 <br />5/11/2022 <br />STOPPING/BLOCKIN <br />KURT KECK <br />NOT READY <br />see notes <br />G <br />Notes. <br />5/10/202212:24 PM C D K CONST SERVICES INC <br />This is a re-0tspetllon request for fire stopping I.I. Paint of contact: Kyle Kinsman 206472 0304. Please all Kyle when you arrive. <br />Contact Name: C D K CONSr SERVICES INC <br />Site Address: 272515TH ST BLDG B <br />Phone : 4257888441 <br />e-Mail: rcorey@cdkmnstruction.com <br />(5/11/2022 2:55 PM KMK) <br />1. Verify with roe marshall that level 1 and 2 have passed their Inspection. <br />2. The electrical permitforthe fire alarm needs a rough in Inspection for the list floor. <br />3. une level is net ready in the Rentw0 units. Both fire caulking and elearial needs inspection -see electrical inspectors notes: <br />(4/28/202210:50 AM NO) <br />OR best floor except bathrooms in film 2 until feeders not finished <br />Printed: Monday, 255eptember, 2023 5of 11 �4 <br />BDPERION <br />