Laserfiche WebLink
EQUIPMENT SCHEDULE 111116 <br /> Engineer-Ap <br /> Drawing Reference proved <br /> Item MY Brand Model Capacity/Rating/Output Supplied b New Reused Equivalent <br /> Pp Y Remark / Allowed <br /> EGW192R Wellhead/Vault/Equipment <br /> Well Vault 1 Dwg.M-1 Utility Vault/Oldcastle Precast 575-LA w/locking steel cover No.57TL-2-332P N/A Boeing With recessed padlock hasp Reused Y <br /> Submersible Pump 1 P-108R Grundfos 16515-14 1.5 HP,460 v,30,60 Hz Contractor w/Danfoss FC202 3x230V NEMA 12 enclosure;12/3 Teflon Twist for Envi Lead New N <br /> Y <br /> Pressure Gauge(water) 2 PI-108Ra/108Rb Ashcroft 35-1009SW-02L-XLL-100# 0-100 PSI Boeing Reused <br /> Pressure Inidicating Transmitter(water) 1 PIT-108R Ashcroft G2-7-MO2-42-W9-100#-G min.0-100 PSI,4-2OmA output signal Boeing w/20'flying leads;compatible w/PLC Reused Y <br /> Flow Indicating Transmitter(water) 1 FI/FIT-108R Siemens SITRANS F M MAG 5100 W with SITRANS F M MAG 5000 2"diam.,4-20MA output signal,NEMA 4 Boeing compatible w/PLC Reused Y <br /> Pressure Transducer(groundwater level meter) 1 LE/LT-108R Instrumentation NW,Inc. PS98i Submersible Pressure Transmitter stainless steel,35 ft WC gauge pressure,FEP cable,4-2OmA output signal Boeing compatible w/PLC Reused Y <br /> Sump Pump 1 Dwg.K-3 Grainger/Dayton 110687 1/2 HP,115 v,64 gpm @ 10' Boeing Reused Y <br /> Sump Pump Switch 1 LS-108R SJE Rhombus SJE Milliamp Master Control Switch(30MANPCNC) normally closed contact Boeing part#1018851;compatible w/PLC Reused Y <br /> Leak Detection Sensor/Shutoff 1 LSH-108R SJE Rhombus SJE Milliamp Master Control Switch(30MANPCNC) normally closed contact Boeing part#1018851;compatible w/PLC Reused Y <br /> NOTES <br /> 1. SEE ELECTRICAL DRAWINGS FOR SPECIFICATIONS AND EQUIPMENT(E.G.,CONTROLS,MOTORS,DRIVES,RELAYS,ETC.)RELATED TO ELECTRICAL COMPONENTS. <br /> 2. ALL EQUIPMENTSHALL INCLUDE ALL NECESSARY ASSOCIATED APPURTENANCES SUCH AS MOUNTING BRACKETS,CABLES,AND OTHER APPROPRIATE HARDWARE REGARDLESS OF <br /> WHETHER LISTED IN THIS SCHEDULE;INSTALL PER MANUFACTURERS SPECIFICATIONS. <br /> 3. CONTRACTOR SHALL NOT USE MERCURY,CRYSTALLINE SILICA,LEAD,CADMIUM,ASBESTOS,CHROMIUM OR RADIOACTIVE MATERIAL WITHOUT PRIOR WRITTEN APPROVAL FROM THE <br /> OWNER.NOTE THAT PRODUCTS LABELED AS"NON-ASBESTOS"MAY CONTAIN ASBESTOS ASA MINOR INGREDIENT AND ARE NOT ALLOWED. <br /> f <br /> B <br /> 3 <br /> 5 <br /> s <br /> 3 <br /> DRAFTED BY: JEFFREY I.VALLUZZI AV 9/30/2020 PROJECT NO. <br /> ���T�-� BOEING EVERETT PLANT-POWDER MILL GULCH 025175120.021 <br /> DESIGNED BY: JERED A.NEWCOMB JAN 9/30/2020 LHIVLAiJ DOWNGRADIENT PLUME INTERIM ACTION-PHASE 2 <br /> ASSOCIATES EGW192 RELOCATION DATE <br /> REVIEWED eY: P11 ER M.ROELEN,P.E. PMR 9/30/2020 SEPTEMBER,2020 <br /> n CALL 2 WORKING DAYS <br /> PRIOR TO EXCAVATION APPROVED Bv: PIPER M.ROELEN,P.E. PMR 9/30/2020 EVERETT,WASHINGTON SHEET <br /> G 1-800424-5555 1302ND AVENUE S. 5 OF 14 <br /> o. DUMP NO WASTE EDMONDS,WASHINGTON 98020 EQUIPMENT SCHEDULE DRAWING NO. <br /> NO. DATE REVISIONS DESIGNED REVIEWED APPROVED "ATus' INITIAL DATE (425)778-0907,FAX(425)778-6409 ��� <br /> DRAINS TO STREAM 90%DESIGN DRAWINGS <br />