My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 9 CITY OF EVERETT PARCEL 2023-12-27
>
Address Records
>
9 CITY OF EVERETT PARCEL
>
9
>
9 9 CITY OF EVERETT PARCEL 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:51:52 PM
Creation date
12/14/2023 11:01:08 AM
Metadata
Fields
Template:
Address Document
Street Name
9 CITY OF EVERETT PARCEL
Street Number
9
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Boeing Company <br /> P.O.Box 3707 <br /> Seattle,WA 98127-2207 <br /> APPROVED <br /> PUBLIC WORKS DEPARTMENT <br /> BY: SFandler <br /> October 1, 2020 DATE: 12/17/2020 <br /> DAT-2020-031 CITY OF EVERETT REVIEWED FOR PERMIT <br /> City of Everett Permit Review <br /> Mr. Paul Bianco EVERETT Status: Permit Approved <br /> Environmental Engineer wa. .0 12/17/2020 3:30:40 PM <br /> Department of Ecology, NW Region Office <br /> 3190 160th Avenue SE Permit #: PW2012-009 <br /> Bellevue, WA 98008-5452 <br /> Subject: Boeing Everett Facility <br /> Powder Mill Gulch Downgradient Plume Interim Action, Phase 2 <br /> EGW192 Relocation Work Plan <br /> Dear Mr. Bianco: <br /> Enclosed please find the following document that presents a work plan to relocate extraction well EGW192, <br /> which is associated with the Powder Mill Gulch Downgradient Plume Interim Action groundwater extraction <br /> and treatment system: <br /> • Downgradient Plume Interim Action, Phase 2, EGW192 Relocation Work Plan, Powder Mill <br /> Gulch, Boeing Everett Plant, Washington, dated October 1, 2020. <br /> This document also includes the engineering design drawings for the extraction well relocation. <br /> Hard copies will be produced and mailed to your attention after we have reached the appropriate phase of <br /> the Governor's Safe Start Washington Reopening Plan. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> Debbie Taege <br /> Project Manager <br /> Boeing EHS Remediation <br /> deborah.a.taege@boeing.com <br /> Office Phone (425)965-3745 <br /> CC: <br /> Paul McKee City of Everett(electronic copy) <br /> Heather Griffin City of Everett(electronic copy) <br /> Steve Ingalsbe City of Everett(electronic copy) <br /> Sabrina Fandler City of Everett(electronic copy) <br /> Greg Bertch Seaway West, LLC (electronic copy) <br /> Dr. Tong Li Groundwater Solutions (electronic& 1 hard copy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.