Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/30/2023 3/30/2023 BLDG 03- RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> FOUNDATION WALL <br /> Notes: <br /> 3/28/2023 1:43 PM HAACK BROTHERS INCORPORATED <br /> Contact Name:HAACK BROTHERS INCORPORATED <br /> Site Address:5611 COLBY AVE <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBROTHERS.COM <br /> BLDG 05- <br /> 4/26/2023 4/26/2023 UNDERFLOOR KURT KECK APPROVAL eTRAKiT Inspection Request <br /> FRAMING <br /> Notes: <br /> 4/17/2023 7:02 AM HAACK BROTHERS INCORPORATED <br /> Contact Name:HAACK BROTHERS INCORPORATED <br /> Site Address:5611 COLBY AVE <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBROTHERS.COM <br /> 5/11/2023 5/11/2023 BLDG 07-EXTERIOR Matt Schreifels CORRECTION eTRAKiT Inspection Request <br /> SHEAR REQUIRED <br /> Notes: <br /> 5/10/2023 7:59 AM HAACK BROTHERS INCORPORATED <br /> Contact Name:HAACK BROTHERS INCORPORATED <br /> Site Address:5611 COLBY AVE <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBROTHERS.COM <br /> Inspector RFK changed the inspection assignment from RFK to MAS <br /> LSTHD8 R1 missing on the right end of Shear wall#2.Shear wall#two and#three require special inspections. No LTP4's installed at shear wall 2x bottom <br /> plates.Sliding glass door and windows installed,unable to verify shear wall edge nailing in these locations.Correct items and reschedule new exterior <br /> shear wall inspection. <br /> 5/18/2023 5/18/2023 BLDG 07-EXTERIOR I RAKEEB KHAN APPROVAL <br /> SHEAR <br /> Notes: <br /> Inspected 5/17/2023.Contractor adding nails on one shearwall to meet nail spacing.Corrections made.Shearwall special inspection waved. Minor 4 <br /> inch shearwalls. <br /> 7/31/2023 7/31/2023 BLDG 08-FRAMING Matt Schreifels PARTIALAPPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 7/26/2023 4:04 PM HAACK BROTHERS INCORPORATED <br /> Contact Name:HAACK BROTHERS INCORPORATED <br /> Site Address:5611 COLBY AVE <br /> Phone:4253977360 <br /> e-Mail:JOEL@HAACKBROTHERS.COM <br /> Addition framing only.Schedule framing inspection for phase 2(framing at exist rear wall to be removed). <br /> I <br /> Printed: Monday, 25 September, 2023 2 of 4 <br /> SUPERION <br />