Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />12/27/2022 <br />12/27/2022 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />NOT READY <br />See notes <br />Notes: <br />Framing not ready. <br />Infill CFS wall is OK. Non -bearing infill. <br />12/27/2022 <br />12/27/2022 <br />BLDG 12- <br />RAKEEB KHAN <br />PARTIAL <br />INSULATION <br />APPROVAL <br />Notes: <br />206-605-0427 <br />HBARGREEN@AOL.COM <br />PER HOWIE (425-760-9336) OK TO RESCHEDUL FROM 12/23 TO 12/27 DUE TO WEATHER <br />Insulation in infill wall is ok. DO NOT COVER area where brace is to be installed. Discuss with engineer before covering. See framing and foundation <br />inspection notes. <br />1/27/2023 <br />1/27/2023 <br />BLDG 10-DRYWALL <br />KURT KECK <br />APPROVAL <br />Re Store front wall <br />NAILING <br />Notes: <br />HOWIE BARGREEN 425-760-9336 <br />HBARGREEN@AOL.COM <br />Store front wall infill framing ok (see 12/27) <br />8/21/2023 <br />F8/21/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />hbargreen@aol.com <br />See sheet SC-6. Follow details regarding bracing and connections. Missing bracing. No access to roof so unable to verify parapet connections and <br />uncover beam on exterior side to verify beam splice connection. Upload all special inspection reports. <br />9/6/2023 <br />9/6/2023 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />hbargreen@aol.com <br />425-760-9336 <br />rfk changed Inspection Type from BLDG 16-FINAL to BLDG 08-FRAMING <br />Missing framing and connections per 6/SC-6. Do not complete shear wall type 3 until connections and framing is verified. Blocking is not full depth. <br />Details specify clips from blocking to roof deck. Unable to verify roof top connections. <br />Missing framing and connections per 6/SC-6. Do not complete shear wall type 3 until connections and framing is verified. Blocking is not full depth. <br />Details specify clips from blocking to roof deck. Unable to verify roof top connections. <br />10/3/2023 <br />10/3/2023 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />PARTIAL <br />APPROVAL <br />Notes: <br />hbargreen@aol.com <br />425-760-9336 <br />rfk changed Inspection Type from BLDG 16-FINAL to BLDG 08-FRAMING <br />Contractor to provide photos of framing on roof when work is complete. Interior and exterior store front wall ok to cover. See shear wall type for nailing <br />requirements. Will verify clips from shearwalls to framing above at next inspection. <br />10/10/2023 <br />10/10/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />APPRVD-PERMIT <br />as noted <br />FINAL <br />Notes: <br />hbargreen@aol.com <br />425-760-9336 <br />I <br />Printed: Wednesday, 11 October, 2023 2 of 3 rk <br />SUPERION <br />