My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9612 19TH AVE SE B 2023-12-18
>
Address Records
>
19TH AVE SE
>
9612
>
9612 19TH AVE SE B 2023-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:07:32 PM
Creation date
12/15/2023 1:34:50 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9612
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WARRINGTON <br />12/19/2022 <br />12/19/2022 <br />BLDG DC-UFFR <br />KURT KECK <br />OTHER <br />see 12/6 inspection <br />ROUND <br />Notes. <br />12/14/2022953 AM PACIFIC RIDGE- DRH LLC <br />Contact Name: Brad <br />Site Address: 961219TH AVE SE UNIT 0 <br />Phone: 0252737636 <br />e-Mail: bmowen@paci0cridgehomes.com <br />BLDG 02- <br />12/29/2022 <br />12/29/2022 <br />KU RT KECK <br />APPROVAL <br />FOOTING/SETBACK <br />Notes: <br />12/28/20229:46 AM PACIFIC RIDGE- DRH LLC <br />Re Inspect Pier Pad Whole building'L' 12 back deck, 6 across front, front pads will be poured and placed after sewer connection. <br />Contact Name: Brad <br />Site Address'. 961219TH AVE SE UNIT F <br />Phone:4252232636 <br />e-MaiF. bmowen@pacifcridgehomes.com <br />BLDG 06 <br />1/31/2023 <br />1/31/2023 <br />UNDERSIAB <br />RAKEEB KHAN <br />APPROVAL <br />INSULATION <br />Notes: <br />BLDG 03-FIRE <br />2/6/2023 <br />2/6/2023 <br />STOPPING/BLOCKIN <br />RAKEEB KHAN <br />PARTIAL <br />PARTIAL <br />OVAL <br />Notes. <br />lst floor parry wall only. Horizontal and Vertical blacking added between wall at shear wall location only. <br />BLDG 11-INTERIOR <br />PARTIAL <br />2/6/2023 <br />2/6/2023 <br />RAKEEB KHAN <br />SHEAR <br />APPROVAL <br />Notes: <br />1st floor partywall only. <br />BLDG GA FIRE <br />2/10/2023 <br />2/10/2023 <br />STOPPING/BLOCKIN <br />RAKEEB KHAN <br />PARTIAL <br />TIAL <br />PAROVAL <br />G <br />Notes. <br />Second floor party wall only. Horizontal and Vertical daft stopping added to 2nd floor parry wall <br />2/10/2023 <br />2/10/2023 <br />BLDG 11-INTERIOR <br />RAKEEB KHAN <br />PARTIAL <br />SHEAR <br />APPROVAL <br />Notes: <br />Second Beer partywall Dory. <br />2/16/2023 <br />2/15/2023 <br />BLDG D8-FMMING <br />RAKEEB KHAN <br />PARTIAL <br />APPROVAL <br />Notes'. <br />Ok to atltl plywood fordouble sided shear walls atgarage door locations. Framing at these locations ok. Nate header is continuous. No electrical in <br />these areas. <br />i 31 <br />Printed: Thursday, 215eptember, 2023 2 of swBRION <br />
The URL can be used to link to this page
Your browser does not support the video tag.