My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11929 EVERGREEN WAY 2023-12-27
>
Address Records
>
EVERGREEN WAY
>
11929
>
11929 EVERGREEN WAY 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 8:04:26 AM
Creation date
12/15/2023 2:01:28 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11929
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51.5276 <br /> GEOT E S T I O' @k Harbor <br /> Bellingham I Arlington Oak Harborr <br /> vvww.geotest-i nc.com <br /> ADHESIVE ANCHOR INSPECTION REPORT <br /> PROJECT: 11929 Evergreen Way JOB#: 22-0851 <br /> ADDRESS: 11929 Evergreen Way, Everett, WA REPORT#: AA005 <br /> PERMIT#: B2202-020 DATE: 10/20/2022 <br /> CLIENT: Otak, Inc. PAGE#: 1 of 3 <br /> CONTRACTOR: Otak, Inc. INSPECTOR: Kevin Richardson <br /> Item(s) Inspected Location <br /> 1/2"Hilti HA-E-55(60)All Thread Anchors-Railing Anchors Blue Line Station on Evergreen Way(2782) <br /> Reference Drawing(s): Railing Base Plate Connection on Sheet F1.02 <br /> Item(s) Inspected AComments <br /> Base Material Condition Dry Concrete <br /> Drill Bit Type Carbide Tip <br /> Hole Diameter/Depth /� 5/8"/4" <br /> Hole Cleanliness Blown Out <br /> Anchor Spacing/Edge Distance /� Per Plan <br /> Anchor Type /� Hilti HA-E-55(F1554 Grade 55) <br /> Anchor Diameter/Length 1/2"/4-1/2" <br /> Anchor Embedment 4" <br /> Adhesive Type Hilti Hit HY 200-A <br /> Adhesive Expiration Date 7/2023 <br /> Adhesive ICC-ES Report [� 3963 <br /> Other ❑ <br /> The above items were conforming V Nonconforming Items(see below) ❑ <br /> Comments: GeoTest was on site as requested to provide a special inspection of All Thread <br /> anchors installed at the Blue Line Station (2782). Anchors were generally installed per the <br /> manufacturer's installation instructions and the Railing Base Plate Connection Detail on F1 .02. <br /> At several locations (see images 2 and 3), concrete spalled while drilling. The contractor <br /> discussed on-site with OTAK and is working with them on a solution. <br /> COPIES:Jeff.Massie@otak.com Reviewed by <br /> This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.