Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/5/2022 8/5/2022 BLDG 07-EXTERIOR KURT KECK APPROVAL eTRAKiT Inspection Request <br /> SHEAR <br /> Notes: <br /> 8/3/2022 1:05 PM WEST PEAK BUILDERS INC <br /> Contact Name:WEST PEAK BUILDERS INC <br /> Site Address:2317 VIRGINIA AVE <br /> Phone:9165092165 <br /> e-Mail:OFFICE@WESTPEAKBUILDERS.COM <br /> PERMIT EXTENSION EXTENSION <br /> 4/7/2023 4/7/2023 (REASON Unassigned APPROVED <br /> REQUIRED) <br /> Notes: <br /> project manager was not on top of getting final <br /> 4/14/2023 4/14/2023 BLDG 08-FRAMING RAKEEB KHAN CORRECTION <br /> REQUIRED <br /> Notes: <br /> office@westpeace.com <br /> 425-300-5835 <br /> rfk changed Inspection Type from BLDG 16-FINAL to BLDG 08-FRAMING <br /> No plans on site.Add gable end bracing per truss manufacturer.2x diagonal bracing at 45 degree angle from top plate to blocking between truss top <br /> chords <br /> 5/18/2023 5/18/2023 BLDG 16-FINAL I Matt Schreifels NO ACCESS eTRAKiT Inspection Request <br /> Notes: <br /> 5/10/2023 1:06 PM WEST PEAK BUILDERS INC <br /> Contact Name:WEST PEAK BUILDERS INC <br /> Site Address:2317 VIRGINIA AVE <br /> Phone:9165092165 <br /> e-Mail:OFFICE@WESTPEAKBUILDERS.COM <br /> No Access 5/18/2023 at 10:05am. Please reschedule online when access is available.To speak with an Inspector to get an ETA or to provide access <br /> instructions please call 425-257-8810 option 4 between 730a.m.and 830a.m.the morning of your scheduled inspection. <br /> 6/23/2023 F6/23/2023 BLDG 16-FINAL Matt Schreifels APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> 425-222-2525 <br /> office@westpeakbluiIders.com <br /> I <br /> Printed:Wednesday, 27 September, 2023 2 of 2 rk <br /> SUPERION <br />