Laserfiche WebLink
Permit Inspections <br />VERETT City of Everett <br />WAqHlNrTnN <br />Isolated pier pads not in place. To be inspected at foundation wall inspection. dk changed Inspection Datenme from 01/24/2023 to 01/24/2023 <br />1/24/2023 <br />1/24/2023 <br />BLDG 04-UFER <br />RAKEEB KHAN <br />APPROVAL <br />see notes <br />ROUND <br />Notes: <br />Ufer located rt south end of building <br />UferlaMed at south end of building <br />1/30/2023 <br />1/30/2023 <br />BLDG 03 <br />RAKEEB KHAN <br />APPROVAL <br />see notes <br />FOUNDATION WALL <br />Notes: <br />1/27/20238:08 AM PACIFIC RIME - UNIT LLC <br />Contact Name: brad <br />Site Address: 963219TH AVE SE UNIT <br />Phone : 4252737636 <br />e-Mail: bmowen@pacificridgehomes.com <br />Holdown anchor bolts for hdu holdowns to be wet set. Sthd holdowns In place. Pad relnfprcement ok. <br />BLDG 06 <br />3/6/2023 <br />3/6/2023 <br />UNDERSLAB <br />RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Reques[ <br />INSULATION <br />Notes: <br />3/2/202311:25 AM PACIFIC RIME - DRH LLC <br />the whole building please <br />Contact Name: Jamb Hetlglin <br />Site Address: 90219TH AVE SE UNIT <br />Phone : 4252193355 <br />e-Mail: JDHedglln@pacrfinidgehomes.com <br />3/13/2023 <br />3/13/2023 <br />BLDG 11-INTERIOR <br />RAKER KHAN <br />CORRECTION <br />SHEAR <br />REQUIRED <br />Notes: <br />Missing full length interior sheamall for 1A floor parfywalls. Discussed inspection process for future fire blocking inspections. <br />BLDG 03-FIRE <br />3/14/2023 <br />3/14/2023 <br />STOPPING/BLOCKIN RAKEEB KHAN <br />PARTIAL <br />PARTIAL <br />OVAL <br />Notes: <br />vertical and hormonal fire blocking at In floor party walls only <br />3/14/2023 <br />3/14/2023 <br />BLDG 11-INTERIOR <br />RAKEEB KHAN <br />PARTIAL <br />SHUR <br />APPROVAL <br />Notes. <br />lst floor parry walls onty <br />i <br />Printed: Wednesday, DSep[ember, 2023 2of6 4 <br />sDrERION <br />