My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE B 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE B 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:05:57 AM
Creation date
12/19/2023 8:42:33 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WARIHINATON <br />BLDG W-FIRE <br />3/14/2023 <br />3/14/2023 <br />STOPPING/BLOCKIN <br />FAKEER KHAN <br />PARTIAL <br />APPROVAL <br />G <br />Notes: <br />vertical and h0rizontal fire blocking at 1st floor Party walls Only <br />3/14/2023 <br />3/14/2023 <br />BLDG 11-INTERIOR <br />RAKEEB KHAN <br />PARTIAL <br />SHEAR <br />APPROVAL <br />Notes. <br />Ut floor party walls only <br />BLDG D9-FIRE <br />4/4/2023 <br />4/4/2023 <br />STOPPING/BLOCKIN <br />RAKEEB KHAN <br />PARTIAL <br />APPROVALPAPARTIAL <br />G <br />Notes: <br />3rd Floor party wall. Fire blocking being Installed as usual. Ok to frame up wall. <br />4/4/2023 <br />4/4/2023 <br />BLDG 11-INTERIOR <br />I RAKEEB KHAN <br />PARTIAL <br />SHEAR <br />APPROVAL <br />Notes: <br />3rd floor parry wall. Fire blacking being Installed as usual. OR t0 frame up wall. <br />4/18/2023 <br />4/18/2023 <br />BLDG 08-FMMING <br />RAKEEB KHAN <br />PARTIAL <br />APPROVAL <br />Notes: <br />Garage header constraining ok at location of shearwalls. Otto applysibeatbingto interior side. <br />BLDG 02-EXTERIOR <br />5/18/2023 <br />5/18/2023 <br />RAKEEBKHAN <br />ACCEPTED <br />SHEAR <br />Notes: <br />See attached report <br />5/19/2023 <br />5/24/2023 <br />BLDG 10 DRYWALL <br />RAKEEB KHAN <br />PARTIAL <br />Pre -Rock <br />NAILING <br />APPROVAL <br />Notes: <br />Pre Rock <br />5/22/2023 <br />5/23/2023 <br />BLDG HTDRYWALL <br />Matt Schrelfels <br />PARTIAL <br />NAILING <br />APPROVAL <br />Notes'. <br />Exterior DereGlass at Party Wall <br />6/2/2023 6/2/2023 <br />BLDG I0.DRYWALL <br />Matt Schrerfels <br />NOT READY <br />NAILING <br />Notes: <br />whole building sofitdensglass <br />6/5/2023 6/5/2023 <br />BLDG IUORYWALL <br />Matt SchreNels <br />PARTIAL <br />EAeror under soffit Deneglass <br />NAILING <br />APPROVAL <br />Notes: <br />Exterior under soffit Denswasa <br />Printed: Wednesday, 27 September, 2023 20f4 <br />iy 1 <br />SVPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.