My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE C 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE C 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:33:15 PM
Creation date
12/19/2023 10:22:29 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />VERETT City of Everett <br />WASHINGTON <br />Permit Number: B2208-229 <br />APPlied: 8/30/2022 Approved: 12/8/2022 <br />Issued: 12/12/2022 Finaled: 9/5/2023 <br />Status: FINALED <br />Parent Permit: PW2202-010 <br />Parent Project PREAPP21.023 <br />Details: <br />NEW TOWNHOUSE - GRAYSON SQUARE BLDG 1 <br />Description: NEW TOWNHOUSE - GRAYSON SQUARE BLDG 1 <br />Site Address: 963219TH AVE BE UNIT C <br />City, State Zip Code: EVERETT, WA 98208 <br />Applicant: RHONDA CLANCY <br />Owner: PACIFIC RIDGE-DRH LLC <br />Contractor PACIFIC RIDGE -DRH LLC <br />LIST OF INSPECTIONS <br />SCHEDULED DATE COMPLETED DATE <br />TYPE <br />INSPECTOR RESULT REMARKS <br />1/24/2023 <br />1/24/2023 <br />BLDG 02- <br />BARRED KHAN PARTIAL <br />FOOTING/SETBACK <br />APPROVAL <br />Notes: <br />Isolated pier pads not in place. To be inspected at foundation wall inspection. <br />Isolated pier pads not in place. To be Inspected at foundation wall inspection. <br />Isolated pier pads not in place. To be inspected at foundation wall inspection. <br />Isolated pier pads not in place. To be Inspected at foundation wall inspection. <br />1/24/2023 <br />1/24/2023 <br />BLDG 04-UFER <br />RAKEEB KHAN <br />APPROVAL <br />see notes <br />GROUND <br />Notes'. <br />Ufer located at South end of building <br />Then located at south end of building <br />1/30/2023 <br />1/30/20023 <br />BLDG 03- <br />RAKEEB KHAN <br />APPROVAL <br />see notes <br />FOUNDATION WALL <br />Notes: <br />Heldman anchor bolts for her holdowns to he we set. thd holdowns In place. Pad reinforcement ok. <br />BLDG 06 <br />3/6/2023 <br />3/6/2023 <br />UNDERSLAB <br />BARBEE KHAN <br />APPROVAL <br />INSULATION <br />Notes: <br />BLDG m-FIRE <br />3/14/2023 <br />3/14/2023 <br />STOPPING/gLOCKIN <br />RAKEEB KHAN <br />PARTIAL <br />PARTIAL <br />G <br />OVAL <br />Notes: <br />veripail and horizontal fire blocking at Tat floor parts walls only <br />3/14/2023 <br />3/14/2023 <br />BLDG 11-INTERIOR <br />RAKEED KHAN <br />PARTIAL <br />SHEAR <br />APPROVAL <br />Notes: <br />1st floor parry walls only <br />i /1 <br />Printed: Wednesday, 27 September, 2023 1 of 4 sUPBRION <br />
The URL can be used to link to this page
Your browser does not support the video tag.