Laserfiche WebLink
Example #3 <br />vvarer can us <br />Remove clapper dur- <br />discharged throt <br />ing flushing operation <br />open end of 4 in <br />Install a plug or <br />4 in. <br />(10E Turn) pipe a <br />e ngple <br />and rap <br />102 mm) <br />y Through V or Sia <br />and flush <br />a <br />!% fconneclion vilh <br />underground <br />as shown above <br />beore ovemead <br />plpin9 is <br />A Fire <br />!% <br />/ <br />connected <br />�I ae..on,nowr <br />-. ^ - ....-.. <br />Fail underground <br />Rough-In/Cover <br />PASS FAIL N/A <br />1. Concealment- No drywall or other coverings shall be permitted to conceal any <br />❑ ❑ ❑ <br />components of the fire sprinkler system until after the Rough-In/Cover Inspection <br />has been completed and approved by the fire code official. <br />2. Scheduling- The contractor shall schedule for the inspection using eTRAKT online <br />❑ ❑ ❑ <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the neat business day. <br />3. Approved Plans- Consult Approved/Stamped set of plans. <br />❑ ❑ ❑ <br />4. Size &Type of Piping- Verity proper type and size of piping. <br />❑ ❑ ❑ <br />5. Changes- Confirm the installation of the piping does not have excessive change of <br />❑ ❑ ❑ <br />directions that are not indicated on approved plans. (Excessive use of extra <br />fittings, such as elbows may affect hydraulic calculations). <br />6. Penetrations- All piping penetrations through fire rated assemblies have been <br />❑ ❑ ❑ <br />properly sealed by an approved method. Fire -stopping materials intended for use <br />on nonmetallic piping penetrations shall be investigated for compatibility with the <br />nonmetallic pipe materials. <br />]. Hanger/Bracing/Supports - Piping hangers, sway bracing. and supports shall be <br />❑ ❑ ❑ <br />installed as per plans and NFPA. <br />Fire Marshal's Office 14252576100 1 evereliwa.gov/fire I INFORMATION HANDOUT C-6 14.13,2020 1 Pi <br />