My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE C 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE C 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:33:15 PM
Creation date
12/19/2023 10:22:29 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Insulation Arrangement <br />Caution: It is important that the <br />insulation be installed tight against the <br />joists. In unheated areas, any spaces <br />or voids between the insulation and the <br />joists cause the water in the fire sprinkler <br />piping to freeze. <br />Hydrostatic Test <br />PASS FAIL N/A <br />1. Scheduling- The contractor shall schedule for the inspection using eTRAKfT online <br />❑ ❑ ❑ <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the neat business day. <br />2. 2Hour Test- A member of the Fire Marshal's Off ice will contact the contractor to <br />❑ ❑ ❑ <br />schedule a time for the inspection. The contractor is responsible for verifying that <br />all piping and attached equipment to the system subjected to system working <br />pressure has been under 200 Psi of pressure for a minimum of 2 hours prior to the <br />inspection. Example: Timestamped photograph of pressure gauge. (Loss shall be <br />determined by a drop in the gauge pressure or visual leakage.) <br />3. High Pressure Systems - Portions of systems normally subjected to system <br />El El F-1 <br />working pressures in excess of 150 psi shall be tested at a pressure of 50 psi in <br />excess of system working pressure. <br />4. FDCPiping-Piping between the exterior FDC and the check valve in the fire <br />department inlet pip shall be hydrostatically tested in the same manner as the <br />balance of the system. <br />5. Release Pressure - After verifying that the system has maintained the required 200 <br />El El F-1 <br />psi for 2 hours, release pressure and confirm the test gauge returns to zero. (A <br />gauge that does not return to zero could be an indication that the gauge was <br />pegged.) <br />Fire Marshal's Office 142525761 DO I eerettwa.gov/fire I INFORMATION HANDOUT G6 I4.13,2020I Page] <br />
The URL can be used to link to this page
Your browser does not support the video tag.