Laserfiche WebLink
Insulation Arrangement <br />Caution: It is important that the <br />insulation be installed tight against the <br />joists. In unheated areas, any spaces <br />or voids between the insulation and the <br />joists cause the water in the fire sprinkler <br />piping to freeze. <br />Hydrostatic Test <br />PASS FAIL N/A <br />1. Scheduling- The contractor shall schedule for the inspection using eTRAKfT online <br />❑ ❑ ❑ <br />permitting portal. Inspection requests submitted online before 11:59 p.m. on <br />Monday -Friday will be tentatively scheduled for the neat business day. <br />2. 2Hour Test- A member of the Fire Marshal's Off ice will contact the contractor to <br />❑ ❑ ❑ <br />schedule a time for the inspection. The contractor is responsible for verifying that <br />all piping and attached equipment to the system subjected to system working <br />pressure has been under 200 Psi of pressure for a minimum of 2 hours prior to the <br />inspection. Example: Timestamped photograph of pressure gauge. (Loss shall be <br />determined by a drop in the gauge pressure or visual leakage.) <br />3. High Pressure Systems - Portions of systems normally subjected to system <br />El El F-1 <br />working pressures in excess of 150 psi shall be tested at a pressure of 50 psi in <br />excess of system working pressure. <br />4. FDCPiping-Piping between the exterior FDC and the check valve in the fire <br />department inlet pip shall be hydrostatically tested in the same manner as the <br />balance of the system. <br />5. Release Pressure - After verifying that the system has maintained the required 200 <br />El El F-1 <br />psi for 2 hours, release pressure and confirm the test gauge returns to zero. (A <br />gauge that does not return to zero could be an indication that the gauge was <br />pegged.) <br />Fire Marshal's Office 142525761 DO I eerettwa.gov/fire I INFORMATION HANDOUT G6 I4.13,2020I Page] <br />